Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 24675:2022

ISO 24675:2022 Railway Applications – Running time calculation for timetabling – Part 1: Requirements

CDN $233.00

Description

In order to create punctual timetables, it is necessary to accurately calculate and plan out many values, such as running time between stations, headway between trains, train scheduling, rolling stock scheduling, driver and crew scheduling, operation scheduling in stations and depots and capacity of the line/infrastructure.

Among these values, shortest running time between stations must be calculated first, as this is the basis of timetabling.

This document describes parameters as the requirements for shortest running time calculation that enable railway infrastructure managers, railway operators and related organizations to calculate accurate running time at the stage of setting up a feasible and punctual daily and annual timetable.

In addition, this document shows the appropriateness of calculation by verifying the response observed on the calculated shortest running time when the parameter values are changed.

This document excludes running time calculation used for purposes other than timetabling.

Edition

1

Published Date

2022-10-14

Status

PUBLISHED

Pages

21

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

In order to create punctual timetables, it is necessary to accurately calculate and plan out many values, such as running time between stations, headway between trains, train scheduling, rolling stock scheduling, driver and crew scheduling, operation scheduling in stations and depots and capacity of the line/infrastructure.

Among these values, shortest running time between stations must be calculated first, as this is the basis of timetabling.

This document describes parameters as the requirements for shortest running time calculation that enable railway infrastructure managers, railway operators and related organizations to calculate accurate running time at the stage of setting up a feasible and punctual daily and annual timetable.

In addition, this document shows the appropriateness of calculation by verifying the response observed on the calculated shortest running time when the parameter values are changed.

This document excludes running time calculation used for purposes other than timetabling.

Previous Editions

Can’t find what you are looking for?

Please contact us at: