Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 5879:2023

ISO 5879:2023 Space systems – Ground test for the separation between a launch vehicle and a spacecraft – Requirements for combined separation tests, horizontal separation tests and individual falling separation tests

CDN $273.00

Description

This document provides the test requirements of three typical separation test methods, which are the combined separation test, the horizontal separation test, the individual falling separation test, for the separation between the launch vehicle (LV) and the spacecraft (or between stages of a prototype LV model). It also provides the requirements for the separation test unit, test data, test timing and sequence, pre-test simulation, test environment, exception handling, test results assessment, test documentation, test facilities, test installation, preliminary adjustment of the test setup, measurement and data acquisition.

This document is applicable to test providers and interested parties to implement the separation test between the launch vehicle and the spacecraft.

Edition

1

Published Date

2023-08-14

Status

PUBLISHED

Pages

32

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document provides the test requirements of three typical separation test methods, which are the combined separation test, the horizontal separation test, the individual falling separation test, for the separation between the launch vehicle (LV) and the spacecraft (or between stages of a prototype LV model). It also provides the requirements for the separation test unit, test data, test timing and sequence, pre-test simulation, test environment, exception handling, test results assessment, test documentation, test facilities, test installation, preliminary adjustment of the test setup, measurement and data acquisition.

This document is applicable to test providers and interested parties to implement the separation test between the launch vehicle and the spacecraft.

Previous Editions

Can’t find what you are looking for?

Please contact us at: