Search
×
FR

Placeholder headline

This is just a placeholder headline

API TR 5C3: Calculating Performance Properties of Pipe Used as Casing or Tubing

$

422

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 671: Special Purpose Couplings for Petroleum, Chemical and Gas Industry Services

$

502

BUY NOW

Placeholder headline

This is just a placeholder headline

Technical Report API TBD-10: Chapter 10 Surface and Interfacial Tension

$

176

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 671: Special Purpose Couplings for Petroleum, Chemical and Gas Industry Services: Errata 2

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

MSS SP-44-2026: Steel Pipeline Flanges

$

450

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 576: Inspection of Pressure-relieving Devices

$

460

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 591: Process Valve Qualification Procedure

$

226

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 576: Inspection of Pressure-relieving Devices: Addendum 1

$

0

BUY NOW

ISO 18228:2021

ISO 18228:2021 Design using geosynthetics – Part 2: Separation

CDN $115.00

Description

This document provides general considerations to support the design guidance to geotechnical and civil engineers involved in the design of structures in which a geotextile is used to fulfil the function of separation of soils and below ground structures in contact with natural soils and fills.

These considerations are always based on installed soils, the installation process and on the strength and/or deformation behaviour of geosynthetics.

Edition

1

Published Date

2021-10-22

Status

PUBLISHED

Pages

8

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document provides general considerations to support the design guidance to geotechnical and civil engineers involved in the design of structures in which a geotextile is used to fulfil the function of separation of soils and below ground structures in contact with natural soils and fills.

These considerations are always based on installed soils, the installation process and on the strength and/or deformation behaviour of geosynthetics.

Previous Editions

Can’t find what you are looking for?

Please contact us at: