Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 19244:2014

ISO 19244:2014 Guidance on transition periods for standards developed by ISO/TC 84 – Devices for administration of medicinal products and catheters

CDN $76.00

SKU: c4fbb9b4c5ef Category:

Description

ISO/TR 19244:2014 outlines the recommended transition plans for all the TC 84 standards:

  • Needle-based Injection systems;
  • Sharps Injury Protection;
  • Sharps Containers,
  • Aerosol Drug Delivery Devices;
  • Needle-free injection systems;
  • Syringes;
  • Needles;
  • Intravascular Catheters and Ports.
Edition

1

Published Date

2014-08-07

Status

PUBLISHED

Pages

3

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

ISO/TR 19244:2014 outlines the recommended transition plans for all the TC 84 standards:

  • Needle-based Injection systems;
  • Sharps Injury Protection;
  • Sharps Containers,
  • Aerosol Drug Delivery Devices;
  • Needle-free injection systems;
  • Syringes;
  • Needles;
  • Intravascular Catheters and Ports.

Previous Editions

Can’t find what you are looking for?

Please contact us at: