ISO 16732:2013
ISO 16732:2013 Fire safety engineering – Fire risk assessment – Part 3: Example of an industrial property
CDN $233.00
Description
ISO/TR 16732-3:2013 deals with a fictitious propane storage facility dedicated to the reception of propane transported by tank wagons, the storage of propane in a pressurized vessel and the bulk shipment of propane by tank trucks. The fire risk assessment developed in ISO/TR 16732-3:2013 is not intended to be exhaustive, but is given as an example to illustrate the application of ISO 16732-1 to an industrial facility.
ISO/TR 16732-3:2013 is further limited to design-phase strategies, including changes to the layout of the facility and selection of relevant fire safety strategies (implementation of risk reduction measures). Not included are strategies that operate during the operation phase, including process modifications.
It illustrates the value of fire risk assessment because multiple scenarios are analysed, and several design options are available, which may perform well or not depending on the considered scenario. Risk estimation is needed to determine the result of these different combinations, and overall measures of performance that can be compared between design options. If there were only one scenario of interest, or if the options all tended to perform the same way on all the scenarios, then a simpler type of engineering analysis would suffice.
Edition
1
Published Date
2013-02-19
Status
PUBLISHED
Pages
21
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
ISO/TR 16732-3:2013 deals with a fictitious propane storage facility dedicated to the reception of propane transported by tank wagons, the storage of propane in a pressurized vessel and the bulk shipment of propane by tank trucks. The fire risk assessment developed in ISO/TR 16732-3:2013 is not intended to be exhaustive, but is given as an example to illustrate the application of ISO 16732-1 to an industrial facility.
ISO/TR 16732-3:2013 is further limited to design-phase strategies, including changes to the layout of the facility and selection of relevant fire safety strategies (implementation of risk reduction measures). Not included are strategies that operate during the operation phase, including process modifications.
It illustrates the value of fire risk assessment because multiple scenarios are analysed, and several design options are available, which may perform well or not depending on the considered scenario. Risk estimation is needed to determine the result of these different combinations, and overall measures of performance that can be compared between design options. If there were only one scenario of interest, or if the options all tended to perform the same way on all the scenarios, then a simpler type of engineering analysis would suffice.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

ISO 41011:2024 Facility management – Vocabulary
CDN $233.00 Add to cart -

ISO 11799:2024 Information and documentation – Document storage requirements for archive and library materials
CDN $312.00 Add to cart -

ISO 3877:1978 Tyres, valves and tubes – List of equivalent terms – Part 3: Tubes
CDN $76.00 Add to cart -

ISO 13943:2023 Fire safety – Vocabulary
CDN $351.00 Add to cart