Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 21927:2018

ISO 21927:2018 Smoke and heat control systems – Part 5: Powered smoke exhaust systems – Requirements and design

CDN $173.00

SKU: 67a11716449c Categories: ,

Description

This document applies to powered smoke exhaust systems in spaces with a large area and with a ceiling height of minimum 3 m, in which smoke protection is required. It includes tables and calculation methods for the design of clear layers in order to comply, inter alia, with the requirements of various protection objectives.

This document includes information and provisions concerning the requirements for powered smoke exhaust systems, their design and rules for their installation.

NOTE The requirements for testing the ventilators are dealt with in ISO 21927‚Äë3. Other parts of the ISO 21927 series of standards deal with the power supply (ISO 21927‚Äë10), control equipment (ISO 21927‚Äë9) and smoke control ducts and smoke control dampers (ISO 21927‚Äë7 and ISO 21927-8 respectively).

Design, as specified in this document, does not apply to:

– spaces with fixed gas extinguishing systems;

– storage facilities for hazardous materials;

– spaces in which there is a risk of explosions;

– corridors;

– stairwells.

Edition

1

Published Date

2018-11-28

Status

PUBLISHED

Pages

14

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document applies to powered smoke exhaust systems in spaces with a large area and with a ceiling height of minimum 3 m, in which smoke protection is required. It includes tables and calculation methods for the design of clear layers in order to comply, inter alia, with the requirements of various protection objectives.

This document includes information and provisions concerning the requirements for powered smoke exhaust systems, their design and rules for their installation.

NOTE The requirements for testing the ventilators are dealt with in ISO 21927‚Äë3. Other parts of the ISO 21927 series of standards deal with the power supply (ISO 21927‚Äë10), control equipment (ISO 21927‚Äë9) and smoke control ducts and smoke control dampers (ISO 21927‚Äë7 and ISO 21927-8 respectively).

Design, as specified in this document, does not apply to:

- spaces with fixed gas extinguishing systems;

- storage facilities for hazardous materials;

- spaces in which there is a risk of explosions;

- corridors;

- stairwells.

Previous Editions

Can’t find what you are looking for?

Please contact us at: