
ISO 14414:2019
ISO 14414:2019 Pump system energy assessment
CDN $351.00
Description
This document sets the requirements for conducting and reporting the results of a pumping system energy assessment (hereafter referenced as “assessment”) that considers the entire pumping system, from energy inputs to the work performed as the result of these inputs.
The objective of a pumping system energy assessment is to determine the current energy consumption of an existing system and identify ways to improve system efficiency.
These requirements consist of
– organizing and conducting an assessment,
– analysing the data from the assessment, and
– reporting and documenting assessment findings.
This document is designed to be applied, to open and closed loop pumping systems typically used at industrial, institutional, commercial, and municipal facilities, when requested.
This document is focused on assessing electrically-driven pumping systems, which are dominant in most facilities, but is also applicable with other types of drivers, such as steam turbines and engines. The document does not
a) specify how to design a pumping system,
b) give detailed qualifications and expertise required of the person using the International Standard although provides a list of body of knowledge in Annex C,
c) address the training or certification of persons,
d) specify how to implement the recommendations developed during the assessment, but does include requirements for an action plan,
e) specify how to measure and validate the energy savings that result from implementing assessment recommendations,
f) specify how to make measurements and how to calibrate test equipment used during the assessment,
g) specify how to estimate the implementation cost or conduct financial analysis for recommendations developed during the assessment,
h) specify specific steps required for safe operation of equipment during the assessment. The facility personnel in charge of normal operation of the equipment are responsible for ensuring that it is operated safely during the data collection phase of the assessment,
i) address issues of intellectual property, security, confidentiality, and safety.
Edition
2
Published Date
2019-01-30
Status
PUBLISHED
Pages
56
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This document sets the requirements for conducting and reporting the results of a pumping system energy assessment (hereafter referenced as "assessment") that considers the entire pumping system, from energy inputs to the work performed as the result of these inputs.
The objective of a pumping system energy assessment is to determine the current energy consumption of an existing system and identify ways to improve system efficiency.
These requirements consist of
- organizing and conducting an assessment,
- analysing the data from the assessment, and
- reporting and documenting assessment findings.
This document is designed to be applied, to open and closed loop pumping systems typically used at industrial, institutional, commercial, and municipal facilities, when requested.
This document is focused on assessing electrically-driven pumping systems, which are dominant in most facilities, but is also applicable with other types of drivers, such as steam turbines and engines. The document does not
a) specify how to design a pumping system,
b) give detailed qualifications and expertise required of the person using the International Standard although provides a list of body of knowledge in Annex C,
c) address the training or certification of persons,
d) specify how to implement the recommendations developed during the assessment, but does include requirements for an action plan,
e) specify how to measure and validate the energy savings that result from implementing assessment recommendations,
f) specify how to make measurements and how to calibrate test equipment used during the assessment,
g) specify how to estimate the implementation cost or conduct financial analysis for recommendations developed during the assessment,
h) specify specific steps required for safe operation of equipment during the assessment. The facility personnel in charge of normal operation of the equipment are responsible for ensuring that it is operated safely during the data collection phase of the assessment,
i) address issues of intellectual property, security, confidentiality, and safety.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

ISO 5199:2002 Technical specifications for centrifugal pumps – Class II
CDN $351.00 Add to cart -

ISO 3661:1977 End-suction centrifugal pumps – Baseplate and installation dimensions
CDN $76.00 Add to cart -

ISO 20361:2019 Liquid pumps and pumps units – Noise test code – Grades 2 and 3 of accuracy
CDN $233.00 Add to cart -

ISO 17769:2012 Liquid pumps and installation – General terms, definitions, quantities, letter symbols and units – Part 1: Liquid pumps
CDN $390.00 Add to cart







