Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 52930:2021

ISO 52930:2021 Additive manufacturing – Qualification principles – Installation, operation and performance (IQ/OQ/PQ) of PBF-LB equipment

CDN $233.00

SKU: fc4d4c2adad0 Categories: , ,

Description

This document addresses installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) issues directly related to the additive manufacturing system that has a direct influence on the consolidation of material. The first three elements of process validation, process mapping, risk assessment, and validation planning, are necessary pre-conditions to machine qualification, however, they are outside the scope of this document.

This document covers issues directly related to the AM equipment and does not cover feedstock qualification or post processing beyond powder removal.

Physical facility, personnel, process and material issues are only included to the extent necessary to support machine qualification.

Edition

1

Published Date

2021-11-12

Status

PUBLISHED

Pages

20

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document addresses installation qualification (IQ), operational qualification (OQ), and performance qualification (PQ) issues directly related to the additive manufacturing system that has a direct influence on the consolidation of material. The first three elements of process validation, process mapping, risk assessment, and validation planning, are necessary pre-conditions to machine qualification, however, they are outside the scope of this document.

This document covers issues directly related to the AM equipment and does not cover feedstock qualification or post processing beyond powder removal.

Physical facility, personnel, process and material issues are only included to the extent necessary to support machine qualification.

Previous Editions

Can’t find what you are looking for?

Please contact us at: