Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

TEMA 2026 Edition – Online Subscription Only

$

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 15SIH, 2nd Edition: Installation and Handling of Spoolable Reinforced Plastic Line Pipe

$

158

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 754, 4th Edition: Process Safety Performance Indicators for the Refining and Petrochemical Industries

$

393

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME B31.1-2020: Power Piping

$

668

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME B31.1-2022: Power Piping

$

668

BUY NOW

ISO 18828:2016

ISO 18828:2016 Industrial automation systems and integration – Standardized procedures for production systems engineering – Part 2: Reference process for seamless production planning

CDN $307.00

SKU: a3da991b6d7f Category:

Description

ISO 18828-2:2016 describes a reference planning process for seamless production planning.

The scope of the discussed reference process focusses on the planning of production systems such as make-to-stock or assemble-to-order production. The analysis of the process activities has been limited to those within the production planning. The following aspects are within the scope of ISO 18828-2:2016:

· general overview of the reference planning process;

· basic principles of the process model;

· description of each level identified within the reference planning process for production planning;

· structure of activities and relations within each planning discipline;

· dependencies of interdisciplinary activities.

The following items are outside the scope of ISO 18828-2:2016:

· material requirement planning/manufacturing resource planning;

· production order control;

· production process;

· early stage product design;

· order management, inventory management, purchasing, transportation, warehousing;

· production facilities planning/manufacturing facilities planning (physical plant and equipment), including any kind of resource that is not directly related to the manufacturing process;

· value chain (inbound logistics, operations management, outbound logistics, marketing and sales);

· resource visualization;

· process simulation.

Edition

1

Published Date

2016-10-19

Status

PUBLISHED

Pages

32

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

ISO 18828-2:2016 describes a reference planning process for seamless production planning.

The scope of the discussed reference process focusses on the planning of production systems such as make-to-stock or assemble-to-order production. The analysis of the process activities has been limited to those within the production planning. The following aspects are within the scope of ISO 18828-2:2016:

· general overview of the reference planning process;

· basic principles of the process model;

· description of each level identified within the reference planning process for production planning;

· structure of activities and relations within each planning discipline;

· dependencies of interdisciplinary activities.

The following items are outside the scope of ISO 18828-2:2016:

· material requirement planning/manufacturing resource planning;

· production order control;

· production process;

· early stage product design;

· order management, inventory management, purchasing, transportation, warehousing;

· production facilities planning/manufacturing facilities planning (physical plant and equipment), including any kind of resource that is not directly related to the manufacturing process;

· value chain (inbound logistics, operations management, outbound logistics, marketing and sales);

· resource visualization;

· process simulation.

Previous Editions

Can’t find what you are looking for?

Please contact us at: