REGISTER

FR
Search
×
FR

Placeholder headline

This is just a placeholder headline

API SPEC 14L: Lock Mandrels and Landing Nipples : Reaffirmed

$

273

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 20F: Corrosion Resistant Bolting for Use in the Petroleum and Natural Gas Industries : Reaffirmed

$

169

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 5NCL Nickel Content Limits for API 5CT Sour Service Products

$

149

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 19ICD: Inflow Control Devices : Reaffirmed

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 23.2: Reconciliation of Liquid Tank Car(s) Quantities : Reaffirmed

$

218

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16A: Specification for Drill-through Equipment

$

322

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-2: Field Testing Oil-based Drilling Fluids wA1

$

388

BUY NOW

ISO 16484:2024

ISO 16484:2024 Building automation and control systems (BACS) – Part 1: Project specification and implementation

CDN $233.00

Description

This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).

This document specifies the phases required for the BACS project, including

     design (determination of project requirements and production of design documents including technical specifications),

     engineering (detailed function and hardware design),

     installation (installing and commissioning of the BACS), and

     completion (handover, acceptance and project finalization).

This document also specifies the requirements for as-built documentation and training.

This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.

Edition

2

Published Date

2024-01-16

Status

PUBLISHED

Pages

22

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).

This document specifies the phases required for the BACS project, including

-     design (determination of project requirements and production of design documents including technical specifications),

-     engineering (detailed function and hardware design),

-     installation (installing and commissioning of the BACS), and

-     completion (handover, acceptance and project finalization).

This document also specifies the requirements for as-built documentation and training.

This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.