Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 16484:2024

ISO 16484:2024 Building automation and control systems (BACS) – Part 1: Project specification and implementation

CDN $233.00

Description

This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).

This document specifies the phases required for the BACS project, including

     design (determination of project requirements and production of design documents including technical specifications),

     engineering (detailed function and hardware design),

     installation (installing and commissioning of the BACS), and

     completion (handover, acceptance and project finalization).

This document also specifies the requirements for as-built documentation and training.

This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.

Edition

2

Published Date

2024-01-16

Status

PUBLISHED

Pages

22

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).

This document specifies the phases required for the BACS project, including

-     design (determination of project requirements and production of design documents including technical specifications),

-     engineering (detailed function and hardware design),

-     installation (installing and commissioning of the BACS), and

-     completion (handover, acceptance and project finalization).

This document also specifies the requirements for as-built documentation and training.

This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.

Previous Editions

Can’t find what you are looking for?

Please contact us at: