Search
×
FR

Placeholder headline

This is just a placeholder headline

API STD 521: Guide for Pressure-relieving and Depressuring Systems – Edition 6

$

682

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 653: Tank Inspection, Repair, Alteration, and Reconstruction – Edition 4

$

507

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:19 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series-18: Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z246.2-14 – Emergency preparedness and response for petroleum and natural gas industry systems

$

596

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:22 – Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z731-09 (R2014) – Emergency Preparedness and Response

$

177

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:23 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:26 – Storage of Hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA B51:24 Boiler, Pressure Vessel, and Pressure Piping Code

$

389

BUY NOW

ISO 21130:2019

ISO 21130:2019 Ships and marine technology – Major components of emergency towing arrangements

CDN $251.00

SKU: 5c073c6b5d1d Categories: ,

Description

This document specifies the technical requirements, test methods, inspection rules and markings for major components of emergency towing arrangements (ETA) provided for tankers, gas carriers (LPG, LNG, etc.) and chemical vessels no less than 20 000 deadweight tonnes (DWT).

It is only applicable to emergency towing arrangements as defined in 3.1.

NOTE For any other applications, such as for mooring at a single point mooring (SPM) facility, the appropriate standards need to be referred to.

Edition

1

Published Date

2019-04-01

Status

PUBLISHED

Pages

19

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies the technical requirements, test methods, inspection rules and markings for major components of emergency towing arrangements (ETA) provided for tankers, gas carriers (LPG, LNG, etc.) and chemical vessels no less than 20 000 deadweight tonnes (DWT).

It is only applicable to emergency towing arrangements as defined in 3.1.

NOTE For any other applications, such as for mooring at a single point mooring (SPM) facility, the appropriate standards need to be referred to.

Previous Editions

Can’t find what you are looking for?

Please contact us at: