Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

ISO 7554-3:2026 Surgical instruments — Terms, measuring methods and test methods — Part 3: Test methods

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 41002:2026 Facility management — Development of the facility management organization

$

305

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 39004:2026 Road traffic safety — Good practice for service providers using digital platform

$

259

BUY NOW

ISO 10784:2011

ISO 10784:2011 Space systems – Early operations – Part 3: Commissioning report

CDN $129.00

SKU: 79c803a446c7 Categories: ,

Description

A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned change in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to certification for mission operations, the SC is described as a test article in the three parts of ISO 10784. ISO 10784 does not include a requirement for contingency plans, but does include a statement of the need for contingency planning.

ISO 10784-3:2011 outlines general descriptive information for SC initialization and commissioning as might be appropriate for programme management, project engineering or programme test documentation. Since the SC is considered a test article at this phase of its operational life, ISO 17566 is used as a normative reference in constructing the commissioning report. It provides SC manufacturers, SC operators and other stakeholders with a common language and form to verify and document spacecraft initialization and commissioning prior to normal SC mission operations.

Edition

1

Published Date

2011-11-29

Status

PUBLISHED

Pages

7

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

A general definition of initialization is that it begins at separation of the spacecraft (SC) from the launcher. In some cases, a more exact definition will be that initialization begins in flight, upon planned change in mode or state of the SC from the launch configuration. Commissioning is completed when the SC, including its payload, is certified for initial mission operations. Prior to certification for mission operations, the SC is described as a test article in the three parts of ISO 10784. ISO 10784 does not include a requirement for contingency plans, but does include a statement of the need for contingency planning.

ISO 10784-3:2011 outlines general descriptive information for SC initialization and commissioning as might be appropriate for programme management, project engineering or programme test documentation. Since the SC is considered a test article at this phase of its operational life, ISO 17566 is used as a normative reference in constructing the commissioning report. It provides SC manufacturers, SC operators and other stakeholders with a common language and form to verify and document spacecraft initialization and commissioning prior to normal SC mission operations.

Previous Editions

Can’t find what you are looking for?

Please contact us at: