Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

Placeholder headline

This is just a placeholder headline

Technical Report API TDB-4

$

245

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 1192 Transportation of Carbon Dioxide by Pipeline

$

323

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.8: Guidelines for Pre-loading Inspection of Marine Vessel Cargo Tanks and Their Cargo

$

223

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 14A: Subsurface Safety Valve and Annular Safety Valve Equipment

$

493

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16C: Choke and Kill Equipment

$

370

BUY NOW

API SPEC 16FI

API 16FI Frac Iron Guidelines and Requirements

CDN $129.00

This publication was last reviewed and confirmed in 2026.

Description

This document establishes minimum guidelines that set the foundation for reducing the severity and frequency of failures in frac iron equipment. This document covers temporarily installed pressure-containing equipment (commonly known as frac iron) used to convey stimulation fluids from the fluid end to the wellhead, inclusive of pump-down equipment associated with plug and perforating or ball-drop operations. This document addresses the following equipment:

a) piping or treating lines;
b) connections;
c) hoses;
d) manifolds;
e) pressure-relief devices.

 

Edition

1

Published Date

2026-01-16

Status

Current

Pages

45

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document establishes minimum guidelines that set the foundation for reducing the severity and frequency of failures in frac iron equipment. This document covers temporarily installed pressure-containing equipment (commonly known as frac iron) used to convey stimulation fluids from the fluid end to the wellhead, inclusive of pump-down equipment associated with plug and perforating or ball-drop operations. This document addresses the following equipment: a) piping or treating lines; b) connections; c) hoses; d) manifolds; e) pressure-relief devices.  

Previous Editions

Can’t find what you are looking for?

Please contact us at: