Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

ISO 7554-3:2026 Surgical instruments — Terms, measuring methods and test methods — Part 3: Test methods

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 41002:2026 Facility management — Development of the facility management organization

$

305

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 39004:2026 Road traffic safety — Good practice for service providers using digital platform

$

259

BUY NOW

ISO 11295:2026

ISO 11295:2026 Plastics piping systems used for the rehabilitation of pipelines — Classification and overview of strategic, tactical and operational activities

CDN $380.00

This publication was last reviewed and confirmed in 2026.

Plastics piping systems used for the rehabilitation of pipelines — Classification and overview of strategic, tactical and operational activities

Description

This document establishes the steps of the overall process of pipeline rehabilitation, comprising:

  • strategic and tactical activities:
  1. investigation and condition assessment of the existing pipeline;
  2. pipeline rehabilitation planning;
  • operational activities:
  1. project specification;
  2. applications of techniques;
  3. documentation of the design and application process.

This document defines general terms of pipeline rehabilitation and establishes the classification of families of renovation and trenchless replacement techniques, with description of their respective features.

This document is applicable to underground drains and sewers and underground water and gas supply networks.

This document does not apply to:

  • new construction provided as network extensions;
  • calculation methods to determine, for each viable technique, the characteristics of lining or replacement pipe material needed to secure the desired performance of the rehabilitated pipeline;
  • techniques providing non-structural pipe liners;
  • techniques for repair.
Edition

4

Published Date

2026-06-18

Status

PUBLISHED

Pages

69

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document establishes the steps of the overall process of pipeline rehabilitation, comprising:

  • strategic and tactical activities:
  1. investigation and condition assessment of the existing pipeline;
  2. pipeline rehabilitation planning;
  • operational activities:
  1. project specification;
  2. applications of techniques;
  3. documentation of the design and application process.

This document defines general terms of pipeline rehabilitation and establishes the classification of families of renovation and trenchless replacement techniques, with description of their respective features.

This document is applicable to underground drains and sewers and underground water and gas supply networks.

This document does not apply to:

  • new construction provided as network extensions;
  • calculation methods to determine, for each viable technique, the characteristics of lining or replacement pipe material needed to secure the desired performance of the rehabilitated pipeline;
  • techniques providing non-structural pipe liners;
  • techniques for repair.

Previous Editions

Can’t find what you are looking for?

Please contact us at: