Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 10.8, 3rd Edition: Standard Test Method for Sediment in Crude Oil by Membrane Filtration

$

114

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/TR 42505:2026 Sharing economy — Shared manufacturing — Concepts and models

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 4306-1:2026 Cranes — Vocabulary — Part 1: General

$

436

BUY NOW

ISO 24359-1:2026

ISO 24359-1:2026 Building commissioning process planning — Part 1: New buildings

CDN $296.00

This publication was last reviewed and confirmed in 2026.

Building commissioning process planning — Part 1: New buildings

Description

This document addresses the development of a building commissioning (Cx) plan for new construction, major renovations, or system and assembly replacement projects. The commissioning plan incorporates commissioning activities which begin during early project stages, and continue through pre-design, design, construction, turnover and the first year of operation. The commissioning plan is developed during the design stage and also address later stages of the project.

The commissioning plan presents the intended process to verify and document that the quality of the built project in operation meets the requirements of the owner. This document provides an overarching process for the planning of commissioning any aspect of a building project and is intended for use with system or discipline specific standards. This document does not include retro-commissioning or recommissioning in existing buildings.

Edition

1

Published Date

2026-06-19

Status

PUBLISHED

Pages

27

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document addresses the development of a building commissioning (Cx) plan for new construction, major renovations, or system and assembly replacement projects. The commissioning plan incorporates commissioning activities which begin during early project stages, and continue through pre-design, design, construction, turnover and the first year of operation. The commissioning plan is developed during the design stage and also address later stages of the project.

The commissioning plan presents the intended process to verify and document that the quality of the built project in operation meets the requirements of the owner. This document provides an overarching process for the planning of commissioning any aspect of a building project and is intended for use with system or discipline specific standards. This document does not include retro-commissioning or recommissioning in existing buildings.

Previous Editions

Can’t find what you are looking for?

Please contact us at: