
BPVC.III.1.NE-2023
BPVC.III.1.NE-2023: Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NE, Class MC Components (Previous Edition)
CDN $1,034.00
Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NE, Class MC Components
Description
This Subsection contains requirements for the material, design, fabrication, examination, testing and overpressure protection of items which are intended to conform to the requirements for Class MC construction. The rules of Subsection NE cover the requirements for assuring the structural integrity of items. Careful application of this Section will help users to comply with applicable regulations within their jurisdictions, while achieving the operational, cost and safety benefits to be gained from the many industry best-practices detailed within these volumes.
Edition
Not found
Published Date
2026-07-28
Status
Previous Edition
Pages
163
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This Subsection contains requirements for the material, design, fabrication, examination, testing and overpressure protection of items which are intended to conform to the requirements for Class MC construction. The rules of Subsection NE cover the requirements for assuring the structural integrity of items. Careful application of this Section will help users to comply with applicable regulations within their jurisdictions, while achieving the operational, cost and safety benefits to be gained from the many industry best-practices detailed within these volumes.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

BPVC.XI.1-2023: Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 1, Rules for Inspection and Testing of Components of Light-Water-Cooled Plants (Previous Edition)
CDN $1,495.00 Add to cart -

BPVC.III.3-2023: Section III, Rules for Construction of Nuclear Facility Components, Division 3, Containment Systems for Transportation and Storage of Spent Nuclear Fuel and High-Level Radioactive Material (Previous Edition)
CDN $1,177.00 Add to cart -

BPVC.III.A-2023: Section III, Rules for Construction of Nuclear Facility Components, Appendices (Previous Edition)
CDN $1,249.00 Add to cart -

BPVC.III.1.NB-2023: Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NB, Class 1 Components (Previous Edition)
CDN $1,122.00 Add to cart







