Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

B51-14 (R2019) – Boiler, pressure vessel, and pressure piping code

$

362

BUY NOW

ISO 19905-4:2026

ISO 19905-4:2026 Site-specific assessment of mobile offshore units — Part 4: Jack-up installation and removal at a site

CDN $435.00

This publication was last reviewed and confirmed in 2026.

Site-specific assessment of mobile offshore units — Part 4: Jack-up installation and removal at a site

SKU: 97d7225224fd Category:

Description

This document specifies requirements and guidance for the installation on and removal from site of independent leg jack‑ups for use in the oil and gas industries including lower carbon energy. It addresses the assessment of:

  1. the installation operation from when the jack-up enters the defined safety zone of the host platform or the intended site to when it is elevated to the operating hull elevation above LAT and is ready for operations;
  2. the removal operation from when the jack-up is ready to jack-down to when it departs the defined safety zone.

NOTE 1        Whilst this document is for independent leg jack-ups, many of the provisions can be applied to mat-supported jack-ups.

When the jack-up has propulsion assist or is self-propelled, the provisions of this document related to positioning can be replaced or supplemented as appropriate.

This document excludes the move of the jack-up between sites and elevated operations, which are covered respectively by IMO/Class and ISO 19905-1.

NOTE 2        Whilst this document addresses the installation and removal of a jack-up at a site, RMPs normally include the move of the jack-up between sites (see example RMP in Annex E).

Edition

1

Published Date

2026-09-16

Status

PUBLISHED

Pages

95

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies requirements and guidance for the installation on and removal from site of independent leg jack‑ups for use in the oil and gas industries including lower carbon energy. It addresses the assessment of:

  1. the installation operation from when the jack-up enters the defined safety zone of the host platform or the intended site to when it is elevated to the operating hull elevation above LAT and is ready for operations;
  2. the removal operation from when the jack-up is ready to jack-down to when it departs the defined safety zone.

NOTE 1        Whilst this document is for independent leg jack-ups, many of the provisions can be applied to mat-supported jack-ups.

When the jack-up has propulsion assist or is self-propelled, the provisions of this document related to positioning can be replaced or supplemented as appropriate.

This document excludes the move of the jack-up between sites and elevated operations, which are covered respectively by IMO/Class and ISO 19905-1.

NOTE 2        Whilst this document addresses the installation and removal of a jack-up at a site, RMPs normally include the move of the jack-up between sites (see example RMP in Annex E).

Previous Editions

Can’t find what you are looking for?

Please contact us at: