Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

CSA A123.21:26 – Standard test method for the dynamic wind uplift resistance of membrane-roofing systems

$

236

BUY NOW

Placeholder headline

This is just a placeholder headline

CAN/CSA-A123.2-03 (R2023) – Asphalt-coated roofing sheets

$

150

BUY NOW

Placeholder headline

This is just a placeholder headline

A123.23-15 (R2025) – Product specification for polymer-modified bitumen sheet, prefabricated and reinforced

$

118

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA A123.24:21 (R2026) – Standard test method for wind resistance of vegetated roof assembly

$

161

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA A123.25:18 (R2023) – Asphalt core boards used in roofing

$

197

BUY NOW

Placeholder headline

This is just a placeholder headline

A123.3-05 (R2020) – Asphalt saturated organic roofing felt

$

150

BUY NOW

Placeholder headline

This is just a placeholder headline

CAN/CSA-A123.4-04 (R2023) – Asphalt for constructing built-up roof coverings and waterproofing systems

$

150

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA A123.5:16 (R2020) – Asphalt shingles made from glass felt and surfaced with mineral granules

$

197

BUY NOW

N287.6-11 (R2021)

N287.6-11 (R2021) – Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants

CDN $1,086.00

Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants

SKU: 2421237 Categories: ,

Description

Preface This is the fourth edition of CSA N287.6, Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants. It supersedes the previous editions, published in 1994, 1980, and 1978 under the title Pre-Operational Proof and Leakage Rate Testing Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants. The title has been changed to reflect a scope change, from addressing CANDU® reactors to including any nuclear power plant. Scope 1.1 This Standard specifies requirements for pre-operational proof and leakage rate testing of concrete containment structures of a containment system that are designated as class containment components. Note: Other components and appurtenances of the containment system may be tested coincident with the tests specified in this Standard provided that the intent of this Standard is observed and the requirements of CSA N285.0 are considered. 1.2 In CSA standards, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; “should” is used to express a recommendation or that which is advised but not required; and “may” is used to express an option or that which is permissible within the limits of the standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

Edition

Not found

Published Date

2026-10-05

Status

Not found

Pages

36

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

Preface This is the fourth edition of CSA N287.6, Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants. It supersedes the previous editions, published in 1994, 1980, and 1978 under the title Pre-Operational Proof and Leakage Rate Testing Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants. The title has been changed to reflect a scope change, from addressing CANDU® reactors to including any nuclear power plant. Scope 1.1 This Standard specifies requirements for pre-operational proof and leakage rate testing of concrete containment structures of a containment system that are designated as class containment components. Note: Other components and appurtenances of the containment system may be tested coincident with the tests specified in this Standard provided that the intent of this Standard is observed and the requirements of CSA N285.0 are considered. 1.2 In CSA standards, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; and "may" is used to express an option or that which is permissible within the limits of the standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

Previous Editions

Can’t find what you are looking for?

Please contact us at: