
N287.6-11 (R2021)
N287.6-11 (R2021) – Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants
CDN $1,086.00
Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants
Description
Preface This is the fourth edition of CSA N287.6, Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants. It supersedes the previous editions, published in 1994, 1980, and 1978 under the title Pre-Operational Proof and Leakage Rate Testing Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants. The title has been changed to reflect a scope change, from addressing CANDU® reactors to including any nuclear power plant. Scope 1.1 This Standard specifies requirements for pre-operational proof and leakage rate testing of concrete containment structures of a containment system that are designated as class containment components. Note: Other components and appurtenances of the containment system may be tested coincident with the tests specified in this Standard provided that the intent of this Standard is observed and the requirements of CSA N285.0 are considered. 1.2 In CSA standards, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; “should” is used to express a recommendation or that which is advised but not required; and “may” is used to express an option or that which is permissible within the limits of the standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.
Edition
Not found
Published Date
2026-10-05
Status
Not found
Pages
36
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
Preface This is the fourth edition of CSA N287.6, Pre-operational proof and leakage rate testing requirements for concrete containment structures for nuclear power plants. It supersedes the previous editions, published in 1994, 1980, and 1978 under the title Pre-Operational Proof and Leakage Rate Testing Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants. The title has been changed to reflect a scope change, from addressing CANDU® reactors to including any nuclear power plant. Scope 1.1 This Standard specifies requirements for pre-operational proof and leakage rate testing of concrete containment structures of a containment system that are designated as class containment components. Note: Other components and appurtenances of the containment system may be tested coincident with the tests specified in this Standard provided that the intent of this Standard is observed and the requirements of CSA N285.0 are considered. 1.2 In CSA standards, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; and "may" is used to express an option or that which is permissible within the limits of the standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

CSA Z245.16:26 – Induction bends
CDN $252.00 Add to cart -

CSA/ANSI Z83.26:20 (R2025)/CSA 2.37:20 (R2025) – Gas-fired outdoor infrared patio heaters
CDN $711.00 Add to cart -

CSA Z245.11:25 – Steel fittings
CDN $409.00 Add to cart -

CSA Z276.2:25 – Liquefied natural gas (LNG) — Floating near-shoreline production, storage, and handling
CDN $472.00 Add to cart







