
CSA/ANSI HGV 4.5:23
CSA/ANSI HGV 4.5:23 – Priority and sequencing equipment for hydrogen vehicle fueling stations
CDN $323.00
Priority and sequencing equipment for hydrogen vehicle fueling stations
Description
Preface This is the second edition of CSA/ANSI HGV 4.5, Priority and sequencing equipment for hydrogen fuelling stations. It supersedes the previous edition published in 2013. The following are the major changes to this edition: a) reorganization of content to ensure consistency with current CSA editorial practices; and b) harmonization with other hydrogen fuelling documents. This Standard is considered suitable for use for conformity assessment within the stated scope of the Standard. CSA Group acknowledges that the development of this Standard was made possible, in part, by the financial support of Natural Resources Canada. This Standard was prepared by the Subcommittee on Hydrogen Dispensing Systems, under the jurisdiction of the Technical Committee on Hydrogen Transportation and the Strategic Steering Committee on Transportation, and has been formally approved by the Technical Committee. This Standard has been developed in compliance with Standards Council of Canada requirements for National Standards of Canada. It has been published as a National Standard of Canada by CSA Group. This Standard has been approved by the American National Standards Institute (ANSI) as an American National Standard. Scope 1.1 Inclusions This Standard applies to priority and sequencing equipment used in compressed gaseous hydrogen fuelling stations and specifies general, materials, construction, and assembly requirements. 1.2 Exclusions This Standard does not apply to equipment already covered by CSA/ANSI HGV 4.9. 1.3 Terminology In this Standard, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the Standard; “should” is used to express a recommendation or that which is advised but not required; and “may” is used to express an option or that which is permissible within the limits of the Standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application. 1.4 Units of measure The values given in SI units are the units of record for the purposes of this Standard. The values given in parentheses are for information and comparison only.
Edition
Not found
Published Date
2026-10-05
Status
Not found
Pages
34
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
Preface This is the second edition of CSA/ANSI HGV 4.5, Priority and sequencing equipment for hydrogen fuelling stations. It supersedes the previous edition published in 2013. The following are the major changes to this edition: a) reorganization of content to ensure consistency with current CSA editorial practices; and b) harmonization with other hydrogen fuelling documents. This Standard is considered suitable for use for conformity assessment within the stated scope of the Standard. CSA Group acknowledges that the development of this Standard was made possible, in part, by the financial support of Natural Resources Canada. This Standard was prepared by the Subcommittee on Hydrogen Dispensing Systems, under the jurisdiction of the Technical Committee on Hydrogen Transportation and the Strategic Steering Committee on Transportation, and has been formally approved by the Technical Committee. This Standard has been developed in compliance with Standards Council of Canada requirements for National Standards of Canada. It has been published as a National Standard of Canada by CSA Group. This Standard has been approved by the American National Standards Institute (ANSI) as an American National Standard. Scope 1.1 Inclusions This Standard applies to priority and sequencing equipment used in compressed gaseous hydrogen fuelling stations and specifies general, materials, construction, and assembly requirements. 1.2 Exclusions This Standard does not apply to equipment already covered by CSA/ANSI HGV 4.9. 1.3 Terminology In this Standard, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the Standard; "should" is used to express a recommendation or that which is advised but not required; and "may" is used to express an option or that which is permissible within the limits of the Standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application. 1.4 Units of measure The values given in SI units are the units of record for the purposes of this Standard. The values given in parentheses are for information and comparison only.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

CSA/ANSI Z83.26:20 (R2025)/CSA 2.37:20 (R2025) – Gas-fired outdoor infrared patio heaters
CDN $711.00 Add to cart -

CSA N290.3:22 – Requirements for the containment system of nuclear power plants
CDN $1,243.00 Add to cart -

CSA Z245.11:25 – Steel fittings
CDN $409.00 Add to cart -

CAN/CSA-Z247-15 (R2025) – Damage prevention for the protection of underground infrastructure
CDN $449.00 Add to cart







