Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

CAN/CSA-Z900.2.3:22 – Perfusable organs for transplantation

$

181

BUY NOW

Placeholder headline

This is just a placeholder headline

CAN/CSA-Z900.2.4:22 – Ocular tissues for transplantation

$

142

BUY NOW

Placeholder headline

This is just a placeholder headline

CAN/CSA-Z900.2.5:22 – Lymphohematopoietic cells for transplantation

$

181

BUY NOW

Placeholder headline

This is just a placeholder headline

CAN/CSA-Z902:25 – Blood and blood components

$

354

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z91:26 – Health and safety code for suspended equipment operations

$

268

BUY NOW

Placeholder headline

This is just a placeholder headline

Z94.1-15 (R2025) – Industrial protective headwear – Performance, selection, care, and use

$

158

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z94.2:26 – Hearing protection devices – Performance, selection, care, and use

$

244

BUY NOW

API RP 1172

API RP 1172, 1st Edition: Construction Parallel to Existing Underground Transmission Pipelines

CDN $188.00

This publication was last reviewed and confirmed in 2026.

Construction Parallel to Existing Underground Transmission Pipelines: Reaffirmed

SKU: 3856a2f18d1d Category:

Description

The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the Constructing Party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the “Constructing Party”. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.

Edition

1

Published Date

2014-04-29

Status

Current

Pages

30

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the Constructing Party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the “Constructing Party”. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.

Previous Editions

Can’t find what you are looking for?

Please contact us at: