Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 10.8, 3rd Edition: Standard Test Method for Sediment in Crude Oil by Membrane Filtration

$

114

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/TR 42505:2026 Sharing economy — Shared manufacturing — Concepts and models

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 4306-1:2026 Cranes — Vocabulary — Part 1: General

$

436

BUY NOW

API RP 11S1

API RP 11S1, 4th Edition: Electrical Submersible Pump Dismantle, Inspection and Failure Analysis

CDN $263.00

Electrical Submersible Pump Dismantle, Inspection and Failure Analysis

SKU: 3c84ccd36a90 Category:

Description

This recommended practice (RP) covers the processes and procedures of collecting required information to complete a root cause failure analysis of an electrical submersible pump (ESP) system. These include:

• Procedures for disassembly, inspection, final report, failure classification and corrective actions. Items covered by this recommended practice include pumps, intakes, gas separators, gas handling devices, seals/protectors, motors (induction and permanent magnet motors), gauges, sensors, motor lead extensions, potheads,
and power cables. Tooling and test equipment may differ between suppliers; however, the typical assembly and inspection procedures and principles are generally applicable for most ESP systems.

• Information that should be collected prior to equipment dismantle and inspection as well as specific observations that should be recorded during equipment inspections/teardown/disassembly.

• General equipment drawings which may aid in identifying equipment components. It

Edition

4

Published Date

2022-04-26

Status

Current

Pages

60

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This recommended practice (RP) covers the processes and procedures of collecting required information to complete a root cause failure analysis of an electrical submersible pump (ESP) system. These include:

• Procedures for disassembly, inspection, final report, failure classification and corrective actions. Items covered by this recommended practice include pumps, intakes, gas separators, gas handling devices, seals/protectors, motors (induction and permanent magnet motors), gauges, sensors, motor lead extensions, potheads,
and power cables. Tooling and test equipment may differ between suppliers; however, the typical assembly and inspection procedures and principles are generally applicable for most ESP systems.

• Information that should be collected prior to equipment dismantle and inspection as well as specific observations that should be recorded during equipment inspections/teardown/disassembly.

• General equipment drawings which may aid in identifying equipment components. It