
API RP 14FZ
API RP 14FZ: Recommended Practice for Design, Installation, and Maintenance of Electrical Systems fo
CDN $599.00
This publication was last reviewed and confirmed in 2020.
Description
This document recommends minimum requirements and guidelines for the design, installation, and maintenance of electrical systems on fixed and floating petroleum facilities located offshore. For facilities classified as Division 1 or Division 2, reference API RP 14F, Recommended Practice for Design, Installation, and Maintenance of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I, Division 1 and Division 2 Locations. These facilities include drilling, producing and pipeline transportation facilities associated with oil and gas exploration and production. This recommended practice (RP) is not applicable to Mobile Offshore Drilling Units (MODUs) without production facilities. This document is intended to bring together in one place a brief description of basic desirable electrical practices for offshore electrical systems. The recommended practices contained herein recognize that special electrical considerations exist for offshore petro
Edition
2
Published Date
2013-05-02
Status
Reaffirmed
Pages
188
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This document recommends minimum requirements and guidelines for the design, installation, and maintenance of electrical systems on fixed and floating petroleum facilities located offshore. For facilities classified as Division 1 or Division 2, reference API RP 14F, Recommended Practice for Design, Installation, and Maintenance of Electrical Systems for Fixed and Floating Offshore Petroleum Facilities for Unclassified and Class I, Division 1 and Division 2 Locations. These facilities include drilling, producing and pipeline transportation facilities associated with oil and gas exploration and production. This recommended practice (RP) is not applicable to Mobile Offshore Drilling Units (MODUs) without production facilities. This document is intended to bring together in one place a brief description of basic desirable electrical practices for offshore electrical systems. The recommended practices contained herein recognize that special electrical considerations exist for offshore petro
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API SPEC 10F: Errata 2
CDN $0.00 Add to cart -

API RP 100-2: Environmental Aspects Associated with Exploration and Production Operations including
CDN $195.00 Add to cart -

API RP 100-1: Hydraulic Fracturing — Well Integrity and Fracture Containment
CDN $195.00 Add to cart -

API RP 10B-5: Recommended Practice on Determination of Shrinkage and Expansion of Well Cement Formul
CDN $173.00 Add to cart







