Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 10.8, 3rd Edition: Standard Test Method for Sediment in Crude Oil by Membrane Filtration

$

114

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/TR 42505:2026 Sharing economy — Shared manufacturing — Concepts and models

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 4306-1:2026 Cranes — Vocabulary — Part 1: General

$

436

BUY NOW

API RP 17G5

API RP 17G5, 1st Edition: Subsea Intervention Workover Control Systems

CDN $180.00

Subsea Intervention Workover Control Systems

SKU: c11feccd0e61 Category:

Description

This document provides the requirements for the design, manufacture, and testing of intervention workover control system (IWOCS) equipment typically used in a thru-blowout preventer intervention riser system and an open-water intervention riser system. Some requirements in this document are specific to the execution of end user–defined safety functions. This document defines “safety class control functions” used to operate safety class devices. This document provides guidance on the determination of safety class control functions based on the end user–provided safety functions. Blowout prevention (BOP) control systems are outside the scope of this Recommended Practice and typically are not connected to the IWOCS.

Edition

1

Published Date

2019-11-22

Status

Current

Pages

42

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document provides the requirements for the design, manufacture, and testing of intervention workover control system (IWOCS) equipment typically used in a thru-blowout preventer intervention riser system and an open-water intervention riser system. Some requirements in this document are specific to the execution of end user–defined safety functions. This document defines “safety class control functions” used to operate safety class devices. This document provides guidance on the determination of safety class control functions based on the end user–provided safety functions. Blowout prevention (BOP) control systems are outside the scope of this Recommended Practice and typically are not connected to the IWOCS.

Previous Editions

Can’t find what you are looking for?

Please contact us at: