Search
×
FR

Placeholder headline

This is just a placeholder headline

API STD 521: Guide for Pressure-relieving and Depressuring Systems – Edition 6

$

682

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 653: Tank Inspection, Repair, Alteration, and Reconstruction – Edition 4

$

507

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:19 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series-18: Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z246.2-14 – Emergency preparedness and response for petroleum and natural gas industry systems

$

596

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:22 – Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z731-09 (R2014) – Emergency Preparedness and Response

$

177

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:23 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:26 – Storage of Hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA B51:24 Boiler, Pressure Vessel, and Pressure Piping Code

$

389

BUY NOW

API TR 1PER15K-1

API TR 1PER15K-1: Protocol for Verification and Validation of HPHT Equipment

CDN $315.00

SKU: 1bd658c147d1 Category:

Description

This report focuses on an evaluation process for HPHT equipment in the petroleum and natural gas industries which includes design verification analysis, design validation, material selection considerations, and manufacturing process controls necessary to ensure the equipment is fit-for-service in the applicable HPHT environment. where HPHT environments are intended to mean one or more of the following well conditions exist: a) the completion of the well requires completion equipment or well control equipment assigned a pressure rating greater than 15,000 psig or a temperature rating greater than 350°F; b) the maximum anticipated surface pressure or shut-in tubing pressure is greater than 15,000 psig on the seafloor for a well with a subsea wellhead or at the surface for a well with a surface wellhead; or c) the flowing temperature is greater than 350°F on the seafloor for a well with a subsea wellhead or on the surface for a well with a surface wellhead. The design verification and

Edition

1

Published Date

2013-03-17

Status

Current

Pages

98

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This report focuses on an evaluation process for HPHT equipment in the petroleum and natural gas industries which includes design verification analysis, design validation, material selection considerations, and manufacturing process controls necessary to ensure the equipment is fit-for-service in the applicable HPHT environment. where HPHT environments are intended to mean one or more of the following well conditions exist: a) the completion of the well requires completion equipment or well control equipment assigned a pressure rating greater than 15,000 psig or a temperature rating greater than 350°F; b) the maximum anticipated surface pressure or shut-in tubing pressure is greater than 15,000 psig on the seafloor for a well with a subsea wellhead or at the surface for a well with a surface wellhead; or c) the flowing temperature is greater than 350°F on the seafloor for a well with a subsea wellhead or on the surface for a well with a surface wellhead. The design verification and

Previous Editions

Can’t find what you are looking for?

Please contact us at: