Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 10.8, 3rd Edition: Standard Test Method for Sediment in Crude Oil by Membrane Filtration

$

114

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/TR 42505:2026 Sharing economy — Shared manufacturing — Concepts and models

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 4306-1:2026 Cranes — Vocabulary — Part 1: General

$

436

BUY NOW

API RP 2I

API RP 2I, 3rd Edition: In-Service Inspection of Mooring Hardware for Floating Drilling Units

CDN $317.00

This publication was last reviewed and confirmed in 2025.

In-Service Inspection of Mooring Hardware for Floating Drilling Units : Reaffirmed

SKU: 7d9b1b7b2ca5 Category:

Description

RP 2I provides guidelines for inspecting mooring components of mobile offshore drilling units (MODUs) and permanent floating installations. This edition includes: — inspection guidelines for steel permanent moorings on permanent floating installations are added; — inspection guidelines for fiber ropes used for permanent and MODU moorings are included; — special guidance for MODU mooring inspection in the areas of tropical cyclone is provided. Although this recommended practice was developed for the primary moorings of MODUs and permanent floating installations, some of the guidelines may be applicable to moorings of other floating vessels such as pipe-laying barges and construction vessels. Also some of the guidelines may be applicable to secondary or emergency moorings such as mooring for jack-up units, shuttle tanker mooring, and dynamic positioning (DP) vessel harbor mooring. The applicability of this document to other floating vessels and moorings is left to the discretion of the

Edition

3

Published Date

2008-04-18

Status

Current

Pages

88

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

RP 2I provides guidelines for inspecting mooring components of mobile offshore drilling units (MODUs) and permanent floating installations. This edition includes: — inspection guidelines for steel permanent moorings on permanent floating installations are added; — inspection guidelines for fiber ropes used for permanent and MODU moorings are included; — special guidance for MODU mooring inspection in the areas of tropical cyclone is provided. Although this recommended practice was developed for the primary moorings of MODUs and permanent floating installations, some of the guidelines may be applicable to moorings of other floating vessels such as pipe-laying barges and construction vessels. Also some of the guidelines may be applicable to secondary or emergency moorings such as mooring for jack-up units, shuttle tanker mooring, and dynamic positioning (DP) vessel harbor mooring. The applicability of this document to other floating vessels and moorings is left to the discretion of the

Previous Editions

Can’t find what you are looking for?

Please contact us at: