Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

CSA Z305.8:03 (R2023) – Medical supply units

$

181

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z314:23 – Canadian medical device reprocessing in all health care settings

$

952

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z316.5:25 – Fume hoods and associated exhaust systems

$

158

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z317.1:26 – Special requirements for plumbing installations in health care facilities

$

252

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z317.10:21 (R2026) – Handling of health care waste materials

$

221

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z317.11:17 (R2025) – Area measurement for health care facilities

$

142

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z317.12:25 – Cleaning and disinfecting of health care facilities

$

260

BUY NOW

API RP 2RIM

API RP 2RIM, 1st Edition: Integrity Management of Risers from Floating Production Facilities

CDN $290.00

This publication was last reviewed and confirmed in 2026.

Integrity Management of Risers from Floating Production Facilities

SKU: d6203c813714 Category:

Description

This recommended practice (RP) provides guidance for the integrity management (IM) of risers connected to a permanent floating production system (FPS) used for the drilling, development, production, and storage of hydrocarbons in offshore areas. For the purposes of this recommended practice, a riser has a top boundary that is somewhere at or above the point where it transfers load to the platform structure, and a lower boundary where it transfers load into a foundation, which could be a wellhead, pipeline or subsea structure. The scope of this RP includes: —  structural components of the riser; —  riser top hang-off assembly (i.e. stress joint, flexible joint, tensioner system/air can, bend stiffener); —  appurtenances attached to the riser that are critical to its integrity, including VIV suppression devices and buoyancy modules used to support the riser in any capacity; —  corrosion protection systems; —  insulation; —  other components in the load path or supporting the riser. T

Edition

1

Published Date

2019-09-10

Status

Current

Pages

72

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This recommended practice (RP) provides guidance for the integrity management (IM) of risers connected to a permanent floating production system (FPS) used for the drilling, development, production, and storage of hydrocarbons in offshore areas. For the purposes of this recommended practice, a riser has a top boundary that is somewhere at or above the point where it transfers load to the platform structure, and a lower boundary where it transfers load into a foundation, which could be a wellhead, pipeline or subsea structure. The scope of this RP includes: —  structural components of the riser; —  riser top hang-off assembly (i.e. stress joint, flexible joint, tensioner system/air can, bend stiffener); —  appurtenances attached to the riser that are critical to its integrity, including VIV suppression devices and buoyancy modules used to support the riser in any capacity; —  corrosion protection systems; —  insulation; —  other components in the load path or supporting the riser. T

Previous Editions

Can’t find what you are looking for?

Please contact us at: