Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 10.8, 3rd Edition: Standard Test Method for Sediment in Crude Oil by Membrane Filtration

$

114

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/TR 42505:2026 Sharing economy — Shared manufacturing — Concepts and models

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 4306-1:2026 Cranes — Vocabulary — Part 1: General

$

436

BUY NOW

API RP 1188

API RP 1188: Amendment

CDN $0.00

Addendum 1

SKU: dcacef3aebaf Category:

Description

This recommended practice (RP) covers the integrity management of hazardous liquid pipeline facilities. This RP provides guidance on: high-consequence area impact determinations; data integration; threat identification; risk assessment; inspection and reinspection; preventive and mitigative measures (P&MM); performance measures.

Facilities include terminal and pipeline station piping systems within terminal and pipeline facility boundaries and includes off-plot piping. Off-plot piping includes, but is not limited to, piping between facilities, piping that comes from or goes to a refinery or other type facility, or piping that may cross a road, ditch, or other property outside the confines of a terminal facility. This RP covers the integrity management of all pressure-containing components directly used in the transport or storage of hazardous liquids within a liquids pipeline facility.

Piping for transportation of hazardous liquids, such as but not limited to crude oil, highly vola

Edition

1

Published Date

2023-12-20

Status

Addendum 1

Pages

3

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This recommended practice (RP) covers the integrity management of hazardous liquid pipeline facilities. This RP provides guidance on: high-consequence area impact determinations; data integration; threat identification; risk assessment; inspection and reinspection; preventive and mitigative measures (P&MM); performance measures.

Facilities include terminal and pipeline station piping systems within terminal and pipeline facility boundaries and includes off-plot piping. Off-plot piping includes, but is not limited to, piping between facilities, piping that comes from or goes to a refinery or other type facility, or piping that may cross a road, ditch, or other property outside the confines of a terminal facility. This RP covers the integrity management of all pressure-containing components directly used in the transport or storage of hazardous liquids within a liquids pipeline facility.

Piping for transportation of hazardous liquids, such as but not limited to crude oil, highly vola

Previous Editions

Can’t find what you are looking for?

Please contact us at: