Search
×
FR

Placeholder headline

This is just a placeholder headline

BPVC.V-2025: Section V, Nondestructive Examination

$

1241

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.I-2025: Section I, Rules for Construction of Power Boilers

$

1074

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.VII-2025: Section VII, Recommended Guidelines for the Care of Power Boilers

$

653

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.IV-2025: Section IV, Rules for Construction of Heating Boilers

$

1098

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.VI-2025: Section VI, Recommended Rules for the Care and Operation of Heating Boilers

$

653

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.CC.BPV.S1-2025: 2025 ASME BPVC Code Cases: Boilers and Pressure Vessels, Supplement 1

$

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.X-2025: Section X, Fiber-Reinforced Plastic Pressure Vessels

$

979

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.I-2023: Section I, Rules for Construction of Power Boilers (Previous Edition)

$

963

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.IV-2023: Section IV, Rules for Construction of Heating Boilers (Previous Edition)

$

979

BUY NOW

API RP 686

API RP 686, 2nd Edition: Machinery Installation and Installation Design

CDN $402.00

This publication was last reviewed and confirmed in 2024.

Machinery Installation and Installation Design

SKU: 7eded3751291 Category:

Description

This recommended practice (RP) is intended to provide recommended procedures, practices, and checklists for the installation and precommissioning of new, existing, and reapplied machinery and to assist with the installation design of such machinery for petroleum, chemical, and gas industry services facilities. In general, this RP is intended to supplement vendor instructions and the instructions provided by the original equipment manufacturer (OEM) should be carefully followed with regard to equipment installation and checkout. Most major topics of this RP are subdivided into sections of “Installation Design” and “Installation” with the intent being that each section can be removed and used as needed by the appropriate design or installation personnel.

Edition

2

Published Date

2009-12-03

Status

Current

Pages

236

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This recommended practice (RP) is intended to provide recommended procedures, practices, and checklists for the installation and precommissioning of new, existing, and reapplied machinery and to assist with the installation design of such machinery for petroleum, chemical, and gas industry services facilities. In general, this RP is intended to supplement vendor instructions and the instructions provided by the original equipment manufacturer (OEM) should be carefully followed with regard to equipment installation and checkout. Most major topics of this RP are subdivided into sections of “Installation Design” and “Installation” with the intent being that each section can be removed and used as needed by the appropriate design or installation personnel.

Previous Editions

Can’t find what you are looking for?

Please contact us at: