Search
×
FR

Placeholder headline

This is just a placeholder headline

ISO 12480-5:2026 Cranes — Safe use — Part 5: Bridge and gantry cranes

$

77

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME.BPVC.II.D.C-2025:Section II, Materials, Part D, Properties

$

1030

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME BPVC.II.B-2025: Section II, Materials, Part B, Nonferrous Material Specifications

$

1545

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME BPVC II.D.M-2025: Section II, Materials, Part D, Properties

$

1545

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME BPVC.II.A-2025: BPVC Section II-Materials-Part A-Ferrous Materials Specifications

$

1545

BUY NOW

API STD 976

API STD 976: Refractory Installation Quality Control – Inspection and Testing of AES/RCF Linings and Materials

CDN $265.00

SKU: feda5fc020db Category:

Description

This standard provides installation quality control procedures and lining system design requirements for alkaline earth silicate fiber (AES)/refractory ceramic fiber (RCF) linings and may be used to supplement owner specifications. Materials, equipment, and personnel are qualified by the methods described, and applied refractory quality is closely monitored, based on defined procedures and acceptance criteria. The responsibilities of inspection personnel who monitor and direct the quality control process are also defined. The lining described in this standard is for internal refractory linings on the process side of the equipment. External insulation and jacketing are not covered in this standard.

Edition

2

Published Date

2024-10-22

Status

Current

Pages

33

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This standard provides installation quality control procedures and lining system design requirements for alkaline earth silicate fiber (AES)/refractory ceramic fiber (RCF) linings and may be used to supplement owner specifications. Materials, equipment, and personnel are qualified by the methods described, and applied refractory quality is closely monitored, based on defined procedures and acceptance criteria. The responsibilities of inspection personnel who monitor and direct the quality control process are also defined. The lining described in this standard is for internal refractory linings on the process side of the equipment. External insulation and jacketing are not covered in this standard.

Previous Editions

Can’t find what you are looking for?

Please contact us at: