Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 10845:2011

ISO 10845:2011 Construction procurement – Part 6: Participation of targeted partners in joint ventures in contracts

CDN $312.00

Description

ISO 10845-6:2011 establishes a key performance indicator, in the form of a contract participation goal, relating to the engagement of targeted partners in a joint venture on a contract for the provision of goods, services or engineering and construction works. A contract participation goal may be used to measure the outcomes of a contract in relation to the engagement of targeted partners in a joint venture or to establish a target level of performance for the contractor to achieve or exceed in the performance of a contract.

ISO 10845-6:2011 sets out the methods by which the key performance indicator can be measured, quantified and verified in the performance of the contract in respect of two different targeting strategies: targeting strategy A and targeting strategy B.

Edition

1

Published Date

2011-01-13

Status

PUBLISHED

Pages

42

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

ISO 10845-6:2011 establishes a key performance indicator, in the form of a contract participation goal, relating to the engagement of targeted partners in a joint venture on a contract for the provision of goods, services or engineering and construction works. A contract participation goal may be used to measure the outcomes of a contract in relation to the engagement of targeted partners in a joint venture or to establish a target level of performance for the contractor to achieve or exceed in the performance of a contract.

ISO 10845-6:2011 sets out the methods by which the key performance indicator can be measured, quantified and verified in the performance of the contract in respect of two different targeting strategies: targeting strategy A and targeting strategy B.

Previous Editions

Can’t find what you are looking for?

Please contact us at: