Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 10.8, 3rd Edition: Standard Test Method for Sediment in Crude Oil by Membrane Filtration

$

114

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/TR 42505:2026 Sharing economy — Shared manufacturing — Concepts and models

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 4306-1:2026 Cranes — Vocabulary — Part 1: General

$

436

BUY NOW

ISO 15544:2024

ISO 15544:2024 Oil and gas industries – Offshore production installations – Requirements and guidelines for emergency response

CDN $352.00

SKU: 233913fa6930 Category:

Description

This document specifies objectives, functional requirements and guidelines for emergency response (ER) measures on installations used for the development of offshore hydrocarbon resources. It is applicable to:

     fixed offshore structures;

     floating systems for production, storage and off-loading.

NOTE          For mobile offshore units, the ER plans developed in conformance with the requirements and recommendations of the International Maritime Organization (IMO) are generally adequate for the normal, independent operation of the unit in most locations. The following aspects of ER planning are not generally addressed by IMO and are topics intended for inclusion in the scope of this document where relevant to the specific installation:

      area evacuation, e.g. precautionary evacuation in areas of tropical revolving storms;

      combined operations (where an integrated command and ER system is relevant);

      arctic operations;

      uncontrolled flow from a well.

Edition

2

Published Date

2024-06-03

Status

PUBLISHED

Pages

41

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies objectives, functional requirements and guidelines for emergency response (ER) measures on installations used for the development of offshore hydrocarbon resources. It is applicable to:

-     fixed offshore structures;

-     floating systems for production, storage and off-loading.

NOTE          For mobile offshore units, the ER plans developed in conformance with the requirements and recommendations of the International Maritime Organization (IMO) are generally adequate for the normal, independent operation of the unit in most locations. The following aspects of ER planning are not generally addressed by IMO and are topics intended for inclusion in the scope of this document where relevant to the specific installation:

-      area evacuation, e.g. precautionary evacuation in areas of tropical revolving storms;

-      combined operations (where an integrated command and ER system is relevant);

-      arctic operations;

-      uncontrolled flow from a well.

Previous Editions

Can’t find what you are looking for?

Please contact us at: