Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 10.8, 3rd Edition: Standard Test Method for Sediment in Crude Oil by Membrane Filtration

$

114

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/TR 42505:2026 Sharing economy — Shared manufacturing — Concepts and models

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 4306-1:2026 Cranes — Vocabulary — Part 1: General

$

436

BUY NOW

ISO 16484:2024

ISO 16484:2024 Building automation and control systems (BACS) – Part 1: Project specification and implementation

CDN $263.00

Description

This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).

This document specifies the phases required for the BACS project, including

     design (determination of project requirements and production of design documents including technical specifications),

     engineering (detailed function and hardware design),

     installation (installing and commissioning of the BACS), and

     completion (handover, acceptance and project finalization).

This document also specifies the requirements for as-built documentation and training.

This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.

Edition

2

Published Date

2024-01-16

Status

PUBLISHED

Pages

22

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).

This document specifies the phases required for the BACS project, including

-     design (determination of project requirements and production of design documents including technical specifications),

-     engineering (detailed function and hardware design),

-     installation (installing and commissioning of the BACS), and

-     completion (handover, acceptance and project finalization).

This document also specifies the requirements for as-built documentation and training.

This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.

Previous Editions

Can’t find what you are looking for?

Please contact us at: