Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

TEMA 2026 Edition – Online Subscription Only

$

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 15SIH, 2nd Edition: Installation and Handling of Spoolable Reinforced Plastic Line Pipe

$

158

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 754, 4th Edition: Process Safety Performance Indicators for the Refining and Petrochemical Industries

$

393

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME B31.1-2020: Power Piping

$

668

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME B31.1-2022: Power Piping

$

668

BUY NOW

ISO 16484:2024

ISO 16484:2024 Building automation and control systems (BACS) – Part 1: Project specification and implementation

CDN $259.00

Description

This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).

This document specifies the phases required for the BACS project, including

     design (determination of project requirements and production of design documents including technical specifications),

     engineering (detailed function and hardware design),

     installation (installing and commissioning of the BACS), and

     completion (handover, acceptance and project finalization).

This document also specifies the requirements for as-built documentation and training.

This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.

Edition

2

Published Date

2024-01-16

Status

PUBLISHED

Pages

22

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies guiding principles for project design and implementation and for the integration of other systems into the building automation and control systems (BACS).

This document specifies the phases required for the BACS project, including

-     design (determination of project requirements and production of design documents including technical specifications),

-     engineering (detailed function and hardware design),

-     installation (installing and commissioning of the BACS), and

-     completion (handover, acceptance and project finalization).

This document also specifies the requirements for as-built documentation and training.

This document is not applicable to operation and maintenance, nor is it applicable to retro or continuous commissioning, including a commissioning authority.