Search
×
FR

Placeholder headline

This is just a placeholder headline

API STD 521: Guide for Pressure-relieving and Depressuring Systems – Edition 6

$

682

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 653: Tank Inspection, Repair, Alteration, and Reconstruction – Edition 4

$

507

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:19 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series-18: Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z246.2-14 – Emergency preparedness and response for petroleum and natural gas industry systems

$

596

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:22 – Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z731-09 (R2014) – Emergency Preparedness and Response

$

177

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:23 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:26 – Storage of Hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA B51:24 Boiler, Pressure Vessel, and Pressure Piping Code

$

389

BUY NOW

ISO 16901:2022

ISO 16901:2022 Guidance on performing risk assessment in the design of onshore LNG installations including the ship/shore interface

CDN $379.00

SKU: f6360e87f622 Category:

Description

This document provides a common approach and guidance to those undertaking assessment of the major safety hazards as part of the planning, design, and operation of LNG facilities onshore and at shoreline using risk-based methods and standards, to enable a safe design and operation of LNG facilities. The environmental risks associated with an LNG release are not addressed in this document.

This document is applicable both to export and import terminals but can be applicable to other facilities such as satellite and peak shaving plants.

This document is applicable to all facilities inside the perimeter of the terminal and all hazardous materials including LNG and associated products: LPG, pressurized natural gas, odorizers, and other flammable or hazardous products handled within the terminal.

The navigation risks and LNG tanker intrinsic operation risks are recognised, but they are not in the scope of this document. Hazards arising from interfaces between port and facility and ship are addressed and requirements are normally given by port authorities. It is assumed that LNG carriers are designed according to the IGC code, and that LNG fuelled vessels receiving bunker fuel are designed according to IGF code.

Border between port operation and LNG facility is when the ship/shore link (SSL) is established.

This document is not intended to specify acceptable levels of risk; however, examples of tolerable levels of risk are referenced.

See IEC 31010 and ISO 17776 with regard to general risk assessment methods, while this document focuses on the specific needs scenarios and practices within the LNG industry.

Edition

2

Published Date

2022-12-13

Status

PUBLISHED

Pages

58

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document provides a common approach and guidance to those undertaking assessment of the major safety hazards as part of the planning, design, and operation of LNG facilities onshore and at shoreline using risk-based methods and standards, to enable a safe design and operation of LNG facilities. The environmental risks associated with an LNG release are not addressed in this document.

This document is applicable both to export and import terminals but can be applicable to other facilities such as satellite and peak shaving plants.

This document is applicable to all facilities inside the perimeter of the terminal and all hazardous materials including LNG and associated products: LPG, pressurized natural gas, odorizers, and other flammable or hazardous products handled within the terminal.

The navigation risks and LNG tanker intrinsic operation risks are recognised, but they are not in the scope of this document. Hazards arising from interfaces between port and facility and ship are addressed and requirements are normally given by port authorities. It is assumed that LNG carriers are designed according to the IGC code, and that LNG fuelled vessels receiving bunker fuel are designed according to IGF code.

Border between port operation and LNG facility is when the ship/shore link (SSL) is established.

This document is not intended to specify acceptable levels of risk; however, examples of tolerable levels of risk are referenced.

See IEC 31010 and ISO 17776 with regard to general risk assessment methods, while this document focuses on the specific needs scenarios and practices within the LNG industry.

Previous Editions

Can’t find what you are looking for?

Please contact us at: