Search
×
FR

Placeholder headline

This is just a placeholder headline

API STD 521: Guide for Pressure-relieving and Depressuring Systems – Edition 6

$

682

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 653: Tank Inspection, Repair, Alteration, and Reconstruction – Edition 4

$

507

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:19 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series-18: Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z246.2-14 – Emergency preparedness and response for petroleum and natural gas industry systems

$

596

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:22 – Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z731-09 (R2014) – Emergency Preparedness and Response

$

177

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:23 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:26 – Storage of Hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA B51:24 Boiler, Pressure Vessel, and Pressure Piping Code

$

389

BUY NOW

ISO 16975:2017

ISO 16975:2017 Respiratory protective devices – Selection, use and maintenance – Part 3: Fit-testing procedures

CDN $295.00

Description

ISO 16975-3:2017 specifies guidance on how to conduct fit testing of tight-fitting respiratory protective device (RPD) and on appropriate methods to be used. Fit testing is only one element of a complete RPD programme. The intention of fit testing is to evaluate the effectiveness of the seal between the wearer’s face and the respiratory interface (RI). A complete RPD programme is defined in ISO/TS 16975‚Äë1.

ISO 16975-3:2017 specifies requirements for conducting RPD fit testing and includes

– qualifications/competences of fit-test operators,

– specific fit-testing procedures,

– interpretation of fit-test results, and

– record keeping.

A fit test is not required for escape-only RPD.

Edition

1

Published Date

2017-09-29

Status

PUBLISHED

Pages

28

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

ISO 16975-3:2017 specifies guidance on how to conduct fit testing of tight-fitting respiratory protective device (RPD) and on appropriate methods to be used. Fit testing is only one element of a complete RPD programme. The intention of fit testing is to evaluate the effectiveness of the seal between the wearer's face and the respiratory interface (RI). A complete RPD programme is defined in ISO/TS 16975‚Äë1.

ISO 16975-3:2017 specifies requirements for conducting RPD fit testing and includes

- qualifications/competences of fit-test operators,

- specific fit-testing procedures,

- interpretation of fit-test results, and

- record keeping.

A fit test is not required for escape-only RPD.

Previous Editions

Can’t find what you are looking for?

Please contact us at: