REGISTER

FR
Search
×
FR

Placeholder headline

This is just a placeholder headline

API TR 2583 : Measurement of Produced Water for Custody Transfer

$

174

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 2581: Wet Gas Sampling

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 2581 Wet Gas Sampling : Errata 1

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API 510: Pressure Vessel Inspection Code: In-service Inspection, Rating, Repair, and Alteration

$

481

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 6AV1: Validation of Safety and Shutdown Valves for Sandy Service : Edition 4

$

208

BUY NOW

Placeholder headline

This is just a placeholder headline

API 510: Errata 2

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16B Coiled Tubing, Snubbing and Wireline Well Intervention Equipment

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 5CT: Casing and Tubing w/ Addendum 1

$

518

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 5CT: Casing and Tubing Addendum 1

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 1161: Hazardous Liquid Pipeline Operator Qualification (OQ) : Edition 6

$

301

BUY NOW

ISO 17427:2015

ISO 17427:2015 Intelligent transport systems – Cooperative ITS – Part 6: ‘Core system’ risk assessment methodology

CDN $233.00

Description

The scope of ISO/TR 17427-6:2015 is to identify critical technical and financial risks that can impact the core system deployment supporting C-ITS vehicle and highway systems service provision and to provide means to evaluate such risks.

ISO/TR 17427-6:2015 is designed to embrace C-ITS vehicle and highway systems where there is some institutional involvement and support, by the direct or indirect provision of core system support, and it is the risks associated with the deployment of ?Core Systems’ that provide the focus of this Technical Report.

ISO/TR 17427-6:2015 does not provide a calculated ?global’ risk assessment for C-ITS, but identifies the principal causes of risk, and provides a consistent methodology for a jurisdiction, core system operator, or application service provider, to assess the risks that they face. The objective of this Technical Report is to raise awareness of and consideration of such issues and to give pointers, where appropriate, to standards deliverables existing that provide specifications for all or some of these aspects. This Technical Report does not provide specifications for solutions of these issues.

Edition

1

Published Date

2015-10-22

Status

PUBLISHED

Pages

23

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

The scope of ISO/TR 17427-6:2015 is to identify critical technical and financial risks that can impact the core system deployment supporting C-ITS vehicle and highway systems service provision and to provide means to evaluate such risks.

ISO/TR 17427-6:2015 is designed to embrace C-ITS vehicle and highway systems where there is some institutional involvement and support, by the direct or indirect provision of core system support, and it is the risks associated with the deployment of ?Core Systems' that provide the focus of this Technical Report.

ISO/TR 17427-6:2015 does not provide a calculated ?global' risk assessment for C-ITS, but identifies the principal causes of risk, and provides a consistent methodology for a jurisdiction, core system operator, or application service provider, to assess the risks that they face. The objective of this Technical Report is to raise awareness of and consideration of such issues and to give pointers, where appropriate, to standards deliverables existing that provide specifications for all or some of these aspects. This Technical Report does not provide specifications for solutions of these issues.

Previous Editions

Can’t find what you are looking for?

Please contact us at: