REGISTER

FR
Search
×
FR

Placeholder headline

This is just a placeholder headline

API TR 2583 : Measurement of Produced Water for Custody Transfer

$

174

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 2581: Wet Gas Sampling

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 2581 Wet Gas Sampling : Errata 1

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API 510: Pressure Vessel Inspection Code: In-service Inspection, Rating, Repair, and Alteration

$

481

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 6AV1: Validation of Safety and Shutdown Valves for Sandy Service : Edition 4

$

208

BUY NOW

Placeholder headline

This is just a placeholder headline

API 510: Errata 2

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16B Coiled Tubing, Snubbing and Wireline Well Intervention Equipment

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 5CT: Casing and Tubing w/ Addendum 1

$

518

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 5CT: Casing and Tubing Addendum 1

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 1161: Hazardous Liquid Pipeline Operator Qualification (OQ) : Edition 6

$

301

BUY NOW

ISO 18674:2020

ISO 18674:2020 Geotechnical investigation and testing – Geotechnical monitoring by field instrumentation – Part 4: Measurement of pore water pressure: Piezometers

CDN $351.00

SKU: cd19eefa1a3a Categories: , ,

Description

This document specifies the measurement of pore water pressures and piezometric levels in saturated ground by means of piezometers installed for geotechnical monitoring. General rules of performance monitoring of the ground, of structures interacting with the ground, of geotechnical fills and of geotechnical works are presented in ISO 18674‚Äë1.

If applied in conjunction with ISO 18674-5, the procedures described in this document allow the determination of effective stresses acting in the ground.

This document is applicable to:

– monitoring of water pressures acting on and in geotechnical structures (e.g. quay walls, dikes, excavation walls, foundations, dams, tunnels, slopes, embankments, etc.);

– monitoring of consolidation processes of soil and fill (e.g. beneath foundations and in embankments);

– evaluating stability and serviceability of geotechnical structures;

– checking geotechnical designs in connection with the Observational Design procedure.

NOTE This document fulfils the requirements for the performance monitoring of the ground, of structures interacting with the ground and of geotechnical works by the means of piezometers, installed as part of the geotechnical investigation and testing in accordance with References [4] and [5] This document relates to measuring devices, which are installed in the ground. For pore water pressure measurements carried out in connection with cone penetration tests, see ISO 22476-1.

Edition

1

Published Date

2020-06-26

Status

PUBLISHED

Pages

58

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies the measurement of pore water pressures and piezometric levels in saturated ground by means of piezometers installed for geotechnical monitoring. General rules of performance monitoring of the ground, of structures interacting with the ground, of geotechnical fills and of geotechnical works are presented in ISO 18674‚Äë1.

If applied in conjunction with ISO 18674-5, the procedures described in this document allow the determination of effective stresses acting in the ground.

This document is applicable to:

- monitoring of water pressures acting on and in geotechnical structures (e.g. quay walls, dikes, excavation walls, foundations, dams, tunnels, slopes, embankments, etc.);

- monitoring of consolidation processes of soil and fill (e.g. beneath foundations and in embankments);

- evaluating stability and serviceability of geotechnical structures;

- checking geotechnical designs in connection with the Observational Design procedure.

NOTE This document fulfils the requirements for the performance monitoring of the ground, of structures interacting with the ground and of geotechnical works by the means of piezometers, installed as part of the geotechnical investigation and testing in accordance with References [4] and [5] This document relates to measuring devices, which are installed in the ground. For pore water pressure measurements carried out in connection with cone penetration tests, see ISO 22476-1.

Previous Editions

Can’t find what you are looking for?

Please contact us at: