Search
×
FR

Placeholder headline

This is just a placeholder headline

API STD 521: Guide for Pressure-relieving and Depressuring Systems – Edition 6

$

682

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 653: Tank Inspection, Repair, Alteration, and Reconstruction – Edition 4

$

507

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:19 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series-18: Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z246.2-14 – Emergency preparedness and response for petroleum and natural gas industry systems

$

596

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:22 – Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z731-09 (R2014) – Emergency Preparedness and Response

$

177

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:23 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:26 – Storage of Hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA B51:24 Boiler, Pressure Vessel, and Pressure Piping Code

$

389

BUY NOW

ISO 18828:2016

ISO 18828:2016 Industrial automation systems and integration – Standardized procedures for production systems engineering – Part 2: Reference process for seamless production planning

CDN $295.00

SKU: a3da991b6d7f Category:

Description

ISO 18828-2:2016 describes a reference planning process for seamless production planning.

The scope of the discussed reference process focusses on the planning of production systems such as make-to-stock or assemble-to-order production. The analysis of the process activities has been limited to those within the production planning. The following aspects are within the scope of ISO 18828-2:2016:

· general overview of the reference planning process;

· basic principles of the process model;

· description of each level identified within the reference planning process for production planning;

· structure of activities and relations within each planning discipline;

· dependencies of interdisciplinary activities.

The following items are outside the scope of ISO 18828-2:2016:

· material requirement planning/manufacturing resource planning;

· production order control;

· production process;

· early stage product design;

· order management, inventory management, purchasing, transportation, warehousing;

· production facilities planning/manufacturing facilities planning (physical plant and equipment), including any kind of resource that is not directly related to the manufacturing process;

· value chain (inbound logistics, operations management, outbound logistics, marketing and sales);

· resource visualization;

· process simulation.

Edition

1

Published Date

2016-10-19

Status

PUBLISHED

Pages

32

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

ISO 18828-2:2016 describes a reference planning process for seamless production planning.

The scope of the discussed reference process focusses on the planning of production systems such as make-to-stock or assemble-to-order production. The analysis of the process activities has been limited to those within the production planning. The following aspects are within the scope of ISO 18828-2:2016:

· general overview of the reference planning process;

· basic principles of the process model;

· description of each level identified within the reference planning process for production planning;

· structure of activities and relations within each planning discipline;

· dependencies of interdisciplinary activities.

The following items are outside the scope of ISO 18828-2:2016:

· material requirement planning/manufacturing resource planning;

· production order control;

· production process;

· early stage product design;

· order management, inventory management, purchasing, transportation, warehousing;

· production facilities planning/manufacturing facilities planning (physical plant and equipment), including any kind of resource that is not directly related to the manufacturing process;

· value chain (inbound logistics, operations management, outbound logistics, marketing and sales);

· resource visualization;

· process simulation.

Previous Editions

Can’t find what you are looking for?

Please contact us at: