Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

Placeholder headline

This is just a placeholder headline

Technical Report API TDB-4

$

245

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 1192 Transportation of Carbon Dioxide by Pipeline

$

323

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.8: Guidelines for Pre-loading Inspection of Marine Vessel Cargo Tanks and Their Cargo

$

223

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 14A: Subsurface Safety Valve and Annular Safety Valve Equipment

$

493

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16C: Choke and Kill Equipment

$

370

BUY NOW

ISO 1920:2019

ISO 1920:2019 Testing of concrete – Part 14: Setting time of concrete mixtures by resistance to penetration

CDN $76.00

SKU: 2489800355b9 Categories: ,

Description

This document covers the method for determining the setting time of concrete with slump greater than zero, by testing mortar sieved from the concrete mixture. The initial setting time and the final setting time are the time intervals required for the mortar sieved from the concrete mixture to reach the specified values of penetration resistance after the initial contact of cement and water.

The method can be used for determining the effect of variables such as temperature, type and content of cement, concrete mix proportions and admixtures, on the time of setting and hardening characteristics of concrete.

This test method is applicable under controlled laboratory conditions, as well as under field conditions.

Edition

1

Published Date

2019-11-13

Status

PUBLISHED

Pages

5

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document covers the method for determining the setting time of concrete with slump greater than zero, by testing mortar sieved from the concrete mixture. The initial setting time and the final setting time are the time intervals required for the mortar sieved from the concrete mixture to reach the specified values of penetration resistance after the initial contact of cement and water.

The method can be used for determining the effect of variables such as temperature, type and content of cement, concrete mix proportions and admixtures, on the time of setting and hardening characteristics of concrete.

This test method is applicable under controlled laboratory conditions, as well as under field conditions.

Previous Editions

Can’t find what you are looking for?

Please contact us at: