Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 19455:2019

ISO 19455:2019 Planning for functional performance testing for building commissioning – Part 1: Secondary hydronic pump, system and associated controls

CDN $173.00

SKU: e22af473f799 Categories: ,

Description

This document specifies a planning method for functional performance testing (FPT). This document is applicable to the planning of the FPT during the design phase of new buildings and retrofit projects, which is defined in ISO 16813.

This document establishes how to design building environmental systems when the FPT is being carried out. This document defines the following:

– what kind of information regarding the system is required (for example, design documents, drawings and product specifications);

– what kind of data should be measured (though concrete measurement techniques are not specified in this document);

– how the measured data is analysed.

Such clear definition of the FPT makes it possible for building designers to prepare and plan for FPT throughout the design process.

This document specifies an FPT method for secondary hydronic pump, system and associated controls in heating, ventilation and air conditioning (HVAC) systems.

Edition

1

Published Date

2019-11-15

Status

PUBLISHED

Pages

14

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies a planning method for functional performance testing (FPT). This document is applicable to the planning of the FPT during the design phase of new buildings and retrofit projects, which is defined in ISO 16813.

This document establishes how to design building environmental systems when the FPT is being carried out. This document defines the following:

- what kind of information regarding the system is required (for example, design documents, drawings and product specifications);

- what kind of data should be measured (though concrete measurement techniques are not specified in this document);

- how the measured data is analysed.

Such clear definition of the FPT makes it possible for building designers to prepare and plan for FPT throughout the design process.

This document specifies an FPT method for secondary hydronic pump, system and associated controls in heating, ventilation and air conditioning (HVAC) systems.