Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 20815:2018

ISO 20815:2018 Petroleum, petrochemical and natural gas industries – Production assurance and reliability management

CDN $390.00

SKU: a0ce96a14da4 Categories: ,

Description

This document describes the concept of production assurance within the systems and operations associated with exploration drilling, exploitation, processing and transport of petroleum, petrochemical and natural gas resources. This document covers upstream (including subsea), midstream and downstream facilities, petrochemical and associated activities. It focuses on production assurance of oil and gas production, processing and associated activities and covers the analysis of reliability and maintenance of the components. This includes a variety of business categories and associated systems/equipment in the oil and gas value chain. Production assurance addresses not only hydrocarbon production, but also associated activities such as drilling, pipeline installation and subsea intervention.

This document provides processes and activities, requirements and guidelines for systematic management, effective planning, execution and use of production assurance and reliability technology. This is to achieve cost-effective solutions over the life cycle of an asset development project structured around the following main elements:

– production assurance management for optimum economy of the facility through all of its life cycle phases, while also considering constraints arising from health, safety, environment, and quality;

– planning, execution and implementation of reliability technology;

– application of reliability and maintenance data;

– reliability-based technology development, design and operational improvement.

The IEC 60300-3 series addresses equipment reliability and maintenance performance in general.

This document designates 12 processes, of which seven are defined as core production assurance processes and addressed in this document. The remaining five processes are denoted as interacting processes and are outside the scope of this document. The interaction of the core production assurance processes with these interacting processes, however, is within the scope of this document as the information flow to and from these latter processes is required to ensure that production assurance requirements can be fulfilled.

The only requirement mandated by this document is the establishment and execution of the production assurance programme (PAP). It is important to reflect the PAP in the overall project management in the project for which it applies.

This document recommends that the listed processes and activities be initiated only if they can be considered to add value.

Edition

2

Published Date

2018-10-18

Status

PUBLISHED

Pages

99

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document describes the concept of production assurance within the systems and operations associated with exploration drilling, exploitation, processing and transport of petroleum, petrochemical and natural gas resources. This document covers upstream (including subsea), midstream and downstream facilities, petrochemical and associated activities. It focuses on production assurance of oil and gas production, processing and associated activities and covers the analysis of reliability and maintenance of the components. This includes a variety of business categories and associated systems/equipment in the oil and gas value chain. Production assurance addresses not only hydrocarbon production, but also associated activities such as drilling, pipeline installation and subsea intervention.

This document provides processes and activities, requirements and guidelines for systematic management, effective planning, execution and use of production assurance and reliability technology. This is to achieve cost-effective solutions over the life cycle of an asset development project structured around the following main elements:

- production assurance management for optimum economy of the facility through all of its life cycle phases, while also considering constraints arising from health, safety, environment, and quality;

- planning, execution and implementation of reliability technology;

- application of reliability and maintenance data;

- reliability-based technology development, design and operational improvement.

The IEC 60300-3 series addresses equipment reliability and maintenance performance in general.

This document designates 12 processes, of which seven are defined as core production assurance processes and addressed in this document. The remaining five processes are denoted as interacting processes and are outside the scope of this document. The interaction of the core production assurance processes with these interacting processes, however, is within the scope of this document as the information flow to and from these latter processes is required to ensure that production assurance requirements can be fulfilled.

The only requirement mandated by this document is the establishment and execution of the production assurance programme (PAP). It is important to reflect the PAP in the overall project management in the project for which it applies.

This document recommends that the listed processes and activities be initiated only if they can be considered to add value.