Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

TEMA 2026 Edition – Online Subscription Only

$

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 15SIH, 2nd Edition: Installation and Handling of Spoolable Reinforced Plastic Line Pipe

$

158

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 754, 4th Edition: Process Safety Performance Indicators for the Refining and Petrochemical Industries

$

393

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME B31.1-2020: Power Piping

$

668

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME B31.1-2022: Power Piping

$

668

BUY NOW

ISO 21191:2021

ISO 21191:2021 Equipment for crop protection – Closed transfer systems (CTS) – Performance specification

CDN $261.00

SKU: f53c4aab69f6 Category:

Description

This document specifies operator and environment-related safety requirements and the means of their verification for the design and construction of closed transfer systems (CTS) for liquid formulations of plant protection products (PPP) in 1 l to 20 l containers.

In addition, it specifies the type of information on safe working practices including information about residual risks to be provided by the CTS manufacturer and specifies the maximum potential contamination during any single transfer operation.

Edition

1

Published Date

2021-02-26

Status

PUBLISHED

Pages

21

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies operator and environment-related safety requirements and the means of their verification for the design and construction of closed transfer systems (CTS) for liquid formulations of plant protection products (PPP) in 1 l to 20 l containers.

In addition, it specifies the type of information on safe working practices including information about residual risks to be provided by the CTS manufacturer and specifies the maximum potential contamination during any single transfer operation.

Previous Editions

Can’t find what you are looking for?

Please contact us at: