Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 21484:2017

ISO 21484:2017 Nuclear Energy – Fuel technology – Determination of the O/M ratio in MOX pellets by the gravimetric method

CDN $76.00

SKU: 6d9b26935060 Categories: ,

Description

ISO 21484:2017 describes a method for determining the Oxygen-to-Metal (O/M) ratio in mixed uranium-plutonium oxide (U,Pu)O2 ± X pellets. The parameters given in the following paragraphs are relevant for pellets within a range of O/M ratio corresponding to 1,98 to 2,01. The method described in the document is adapted, with regard to the parameters, if the expected values of O/M ratio are outside the range.

Edition

2

Published Date

2017-01-30

Status

PUBLISHED

Pages

6

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

ISO 21484:2017 describes a method for determining the Oxygen-to-Metal (O/M) ratio in mixed uranium-plutonium oxide (U,Pu)O2 ± X pellets. The parameters given in the following paragraphs are relevant for pellets within a range of O/M ratio corresponding to 1,98 to 2,01. The method described in the document is adapted, with regard to the parameters, if the expected values of O/M ratio are outside the range.

Previous Editions

Can’t find what you are looking for?

Please contact us at: