Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 10.8, 3rd Edition: Standard Test Method for Sediment in Crude Oil by Membrane Filtration

$

114

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/TR 42505:2026 Sharing economy — Shared manufacturing — Concepts and models

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 4306-1:2026 Cranes — Vocabulary — Part 1: General

$

436

BUY NOW

ISO 23135:2022

ISO 23135:2022 Space systems – Verification programme and management process

CDN $310.00

SKU: 267dd953dc95 Categories: ,

Description

This document establishes a set of requirements for planning and executing verification programmes for commercial/non-commercial manned and unmanned space systems.

This document defines a distributed verification programme for each contractor that engages in the development of any element of a space system, starting from the lowest level (i.e. unit/piece part level) and the earliest phase (i.e. requirement phase) to the acceptance and the delivery review of a system’s development as well as the launch site activities.

This document primarily addresses verification associated with space, launch, and ground segment acquisitions. Space support segments including range safety, ground support equipment, and launch operation facilities, which are not otherwise addressed in this document, can also benefit from the described verification programme and management processes.

Edition

1

Published Date

2022-03-31

Status

PUBLISHED

Pages

28

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document establishes a set of requirements for planning and executing verification programmes for commercial/non-commercial manned and unmanned space systems.

This document defines a distributed verification programme for each contractor that engages in the development of any element of a space system, starting from the lowest level (i.e. unit/piece part level) and the earliest phase (i.e. requirement phase) to the acceptance and the delivery review of a system’s development as well as the launch site activities.

This document primarily addresses verification associated with space, launch, and ground segment acquisitions. Space support segments including range safety, ground support equipment, and launch operation facilities, which are not otherwise addressed in this document, can also benefit from the described verification programme and management processes.

Previous Editions

Can’t find what you are looking for?

Please contact us at: