Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 2436:1973

ISO 2436:1973 Heat-resisting equipment wires for aircraft – Methods of test

CDN $76.00

SKU: 998896bfed9a Categories: ,

Description

This International Standard specifies the rest procedures suitable for establishing the compliance of wires with the performance requirements stated in ISO 2032. They are intended for use as a basis for specifying tests in the relevant national specifications when the national type approving authorities consider that existing tests are inadequate. The test procedures are classified in type tests only, type and production routine tests and type and production quality tests.

Edition

1

Published Date

1973-04-01

Status

PUBLISHED

Pages

2

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This International Standard specifies the rest procedures suitable for establishing the compliance of wires with the performance requirements stated in ISO 2032. They are intended for use as a basis for specifying tests in the relevant national specifications when the national type approving authorities consider that existing tests are inadequate. The test procedures are classified in type tests only, type and production routine tests and type and production quality tests.

Previous Editions

Can’t find what you are looking for?

Please contact us at: