Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 27925:2023

ISO 27925:2023 Carbon dioxide capture, transportation and geological storage – Cross cutting issues – Flow assurance

CDN $351.00

SKU: 3fe9dbff801e Category:

Description

This document describes and explains the physical and chemical phenomena, and the technical issues associated with flow assurance in the various components of a carbon dioxide capture and storage (CCS) system and provides information on how to achieve and manage flow assurance. The gaps in technical knowledge, limitations of the tools available and preventative and corrective measures that can be taken are also described.

This document addresses flow assurance of CO2 streams in a CCS project, from CO2 capture via transport by pipeline and injection well through to geological storage. It does not specifically address upstream issues associated with CO2 sources and capture, although flow assurance will inform CO2 capture design and operation, for example, on constraints on the presence of impurities in CO2 streams, as there are too many different capture technologies to be treated in detail in this document.

Vessel transport and buffer storage that are considered in integrated CCS projects under development, are not covered in this document. Flow of material in the supply chain of a CO2 source, even if delivered by a pipeline (e.g. blue hydrogen generation), and flow of gas streams within facilities generating and feeding these into a capture facility can impact flow assurance in CCS projects and networks. These are out of the scope of this document as well.

This document also examines the impact of impurities on the phase behaviour and physical properties of the CO2 stream which in turn can ultimately affect the continuous supply of the CO2 stream from the capture plant, through the transportation system and into the geological reservoir via injection wells.

Flow of fluids in oil reservoirs for the purpose of enhanced oil recovery is not within the scope of this document.

Edition

1

Published Date

2023-07-31

Status

PUBLISHED

Pages

52

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document describes and explains the physical and chemical phenomena, and the technical issues associated with flow assurance in the various components of a carbon dioxide capture and storage (CCS) system and provides information on how to achieve and manage flow assurance. The gaps in technical knowledge, limitations of the tools available and preventative and corrective measures that can be taken are also described.

This document addresses flow assurance of CO2 streams in a CCS project, from CO2 capture via transport by pipeline and injection well through to geological storage. It does not specifically address upstream issues associated with CO2 sources and capture, although flow assurance will inform CO2 capture design and operation, for example, on constraints on the presence of impurities in CO2 streams, as there are too many different capture technologies to be treated in detail in this document.

Vessel transport and buffer storage that are considered in integrated CCS projects under development, are not covered in this document. Flow of material in the supply chain of a CO2 source, even if delivered by a pipeline (e.g. blue hydrogen generation), and flow of gas streams within facilities generating and feeding these into a capture facility can impact flow assurance in CCS projects and networks. These are out of the scope of this document as well.

This document also examines the impact of impurities on the phase behaviour and physical properties of the CO2 stream which in turn can ultimately affect the continuous supply of the CO2 stream from the capture plant, through the transportation system and into the geological reservoir via injection wells.

Flow of fluids in oil reservoirs for the purpose of enhanced oil recovery is not within the scope of this document.