Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 2859:2005

ISO 2859:2005 Sampling procedures for inspection by attributes – Part 5: System of sequential sampling plans indexed by acceptance quality limit (AQL) for lot-by-lot inspection

CDN $312.00

SKU: f13530c46203 Category:

Description

ISO 2859-5:2005 contains sequential sampling schemes that supplement the ISO 2859-1 acceptance sampling system for inspection by attributes, whereby a supplier, through the economic and psychological pressure of lot non-acceptance, can maintain a process average at least as good as the specified acceptance quality limit, while at the same time provide an upper limit for the risk to the consumer of accepting the occasional poor lot.

The sampling schemes defined in ISO 2859-5:2005 are applicable, but not limited, to the inspection of: end items, components and raw materials, operations, materials in process, supplies in storage, maintenance operations, data or records, and administrative procedures.

These schemes are designed to be applied to a continuing series of lots, that is, a series long enough to permit the described switching rules to be applied. These switching rules provide: a) enhanced protection to the consumer (by means of tightened sampling inspection criteria or discontinuation of sampling inspection) should deterioration in quality occur; and b) an incentive, at the discretion of the responsible authority, to reduce inspection costs (by means of reduced sampling inspection criteria) should consistently good quality be demonstrated over time.

The individual sampling plans are not designed to be applicable outside of the schemes in which they are presented. If lots are produced in isolation or in a series too short for ISO 2859-5:2005 to apply, the user is advised to consult ISO 2859-2 for appropriate sampling plans.

Edition

1

Published Date

2005-06-27

Status

PUBLISHED

Pages

43

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

ISO 2859-5:2005 contains sequential sampling schemes that supplement the ISO 2859-1 acceptance sampling system for inspection by attributes, whereby a supplier, through the economic and psychological pressure of lot non-acceptance, can maintain a process average at least as good as the specified acceptance quality limit, while at the same time provide an upper limit for the risk to the consumer of accepting the occasional poor lot.

The sampling schemes defined in ISO 2859-5:2005 are applicable, but not limited, to the inspection of: end items, components and raw materials, operations, materials in process, supplies in storage, maintenance operations, data or records, and administrative procedures.

These schemes are designed to be applied to a continuing series of lots, that is, a series long enough to permit the described switching rules to be applied. These switching rules provide: a) enhanced protection to the consumer (by means of tightened sampling inspection criteria or discontinuation of sampling inspection) should deterioration in quality occur; and b) an incentive, at the discretion of the responsible authority, to reduce inspection costs (by means of reduced sampling inspection criteria) should consistently good quality be demonstrated over time.

The individual sampling plans are not designed to be applicable outside of the schemes in which they are presented. If lots are produced in isolation or in a series too short for ISO 2859-5:2005 to apply, the user is advised to consult ISO 2859-2 for appropriate sampling plans.

Previous Editions

Can’t find what you are looking for?

Please contact us at: