
ISO 3977:2002
ISO 3977:2002 Gas turbines – Procurement – Part 8: Inspection, testing, installation and commissioning
CDN $115.00
Description
This part of ISO 3977 states the principles for systems and procedures to assure the integrity of a packager’s product and services.
It gives guidance on the inspection, testing, installation and commissioning required for the package and packaged equipment. It outlines the responsibilities between the purchaser and packager for inspection, coordination, reporting and recording.
Edition
1
Published Date
2002-07-11
Status
PUBLISHED
Pages
12
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This part of ISO 3977 states the principles for systems and procedures to assure the integrity of a packager's product and services.
It gives guidance on the inspection, testing, installation and commissioning required for the package and packaged equipment. It outlines the responsibilities between the purchaser and packager for inspection, coordination, reporting and recording.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

ISO 5053:2019 Industrial trucks – Vocabulary – Part 2: Fork arms and attachments
CDN $351.00 Add to cart -

ISO 10110:2019 Optics and photonics – Preparation of drawings for optical elements and systems – Part 1: General
CDN $312.00 Add to cart -

ISO 8927:1991 Earth-moving machinery – Machine availability – Vocabulary
CDN $233.00 Add to cart -

ISO 5078:2025 Management of terminology resources – Terminology extraction
CDN $233.00 Add to cart







