Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

TEMA 2026 Edition – Online Subscription Only

$

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 15SIH, 2nd Edition: Installation and Handling of Spoolable Reinforced Plastic Line Pipe

$

158

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 754, 4th Edition: Process Safety Performance Indicators for the Refining and Petrochemical Industries

$

393

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME B31.1-2020: Power Piping

$

668

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME B31.1-2022: Power Piping

$

668

BUY NOW

ISO 5091:2023

ISO 5091:2023 Structural intervention of existing concrete structures using cementitious materials – Part 3: Bottom-surface (soffit) underlaying

CDN $307.00

Description

This document specifies the standards for design and construction using the bottom-surface (soffit) underlaying method. Bottom-surface (soffit) underlaying is a method whereby reinforcing materials are placed on the bottom surface of the slabs or beams whose performance is lower than required and the improvement of durability, serviceability, safety and other performance of the members is achieved by the integrity between the reinforcing materials and existing members.

This document specifies structural intervention of existing concrete structures using cementitious materials design and execution principles, and strategies for defects and on-going deterioration including, but not limited to:

a)       mechanical actions, e.g. fatigue, impact, overloading, movement caused by settlement, blast, vibration, and seismic actions;

b)       chemical and biological actions from environments, e.g. sulfate attack, alkali-aggregate reaction;

c)        physical actions, e.g. freeze–thaw, thermal cracking, moisture movement, salt crystallization, fire, and erosion;

d)       reinforcement corrosion;

e)       original construction defects that remained unaddressed from the time of construction.

Edition

1

Published Date

2023-07-21

Status

PUBLISHED

Pages

28

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies the standards for design and construction using the bottom-surface (soffit) underlaying method. Bottom-surface (soffit) underlaying is a method whereby reinforcing materials are placed on the bottom surface of the slabs or beams whose performance is lower than required and the improvement of durability, serviceability, safety and other performance of the members is achieved by the integrity between the reinforcing materials and existing members.

This document specifies structural intervention of existing concrete structures using cementitious materials design and execution principles, and strategies for defects and on-going deterioration including, but not limited to:

a)       mechanical actions, e.g. fatigue, impact, overloading, movement caused by settlement, blast, vibration, and seismic actions;

b)       chemical and biological actions from environments, e.g. sulfate attack, alkali-aggregate reaction;

c)        physical actions, e.g. freeze–thaw, thermal cracking, moisture movement, salt crystallization, fire, and erosion;

d)       reinforcement corrosion;

e)       original construction defects that remained unaddressed from the time of construction.

Previous Editions

Can’t find what you are looking for?

Please contact us at: