Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

ISO 7554-3:2026 Surgical instruments — Terms, measuring methods and test methods — Part 3: Test methods

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 41002:2026 Facility management — Development of the facility management organization

$

305

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 39004:2026 Road traffic safety — Good practice for service providers using digital platform

$

259

BUY NOW

ISO 62264:2016

ISO 62264:2016 Enterprise-control system integration – Part 3: Activity models of manufacturing operations management

CDN $728.00

SKU: 1353532b9e27 Category:

Description

IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition:
a) 4.1 Manufacturing Operations Management was moved to Part 1 and therefore was removed from Part 3;
b) 4.2 Functional hierarchy was moved to Part 1 and therefore was removed from Part 3;
c) 4.4 Criterion for defining activities below Level 4 was moved to Part 1 and therefore was removed from Part 3;
d) 4.5 Categories of production information was moved to Part 1 and therefore was removed from Part 3;
e) 4.6 Manufacturing operations information was moved to Part 1 and therefore was removed from Part 3;
f) 5.3 Expanded equipment hierarchy model was moved to Part 1 and therefore was removed from Part 3;
g) 5.4 Expanded decision hierarchy model was removed from Part 3. The corresponding section was removed from Part 1 and replaced with a reference to ISO 15704;
h) Annex A (informative) Other enterprise activities affecting manufacturing operations was moved to Part 1 and therefore was removed from Part 3;
i) Annex D (informative) Associated standards was moved to Part 1 and therefore was removed from Part 3;
j) Annex F (informative) Applying the decision hierarchy model to manufacturing operations management was removed from Part 3. The corresponding section was removed from Part 1 and replaced with a reference to ISO 15704;
k) Annex G (informative) Mapping PSLX ontology to manufacturing operations management was removed from Part 3.
The committee felt that this section is more appropriate as a PSLX white paper or TR. The names for data were changed to match the Part 4 standard names. These name changes were made in all figures and in the text.

Edition

2

Published Date

2016-12-16

Status

PUBLISHED

Pages

151

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. IEC 62264-3:2016 defines activity models of manufacturing operations management that enable enterprise system to control system integration. The activities defined in this document are consistent with the object models definitions given in IEC 62264-1. The modelled activities operate between business planning and logistics functions, defined as the Level 4 functions and the process control functions, defined as the Level 2 functions of IEC 62264-1. This second edition cancels and replaces the first edition published in 2007. This edition constitutes a technical revision. This edition includes the following significant technical changes with respect to the previous edition: a) 4.1 Manufacturing Operations Management was moved to Part 1 and therefore was removed from Part 3; b) 4.2 Functional hierarchy was moved to Part 1 and therefore was removed from Part 3; c) 4.4 Criterion for defining activities below Level 4 was moved to Part 1 and therefore was removed from Part 3; d) 4.5 Categories of production information was moved to Part 1 and therefore was removed from Part 3; e) 4.6 Manufacturing operations information was moved to Part 1 and therefore was removed from Part 3; f) 5.3 Expanded equipment hierarchy model was moved to Part 1 and therefore was removed from Part 3; g) 5.4 Expanded decision hierarchy model was removed from Part 3. The corresponding section was removed from Part 1 and replaced with a reference to ISO 15704; h) Annex A (informative) Other enterprise activities affecting manufacturing operations was moved to Part 1 and therefore was removed from Part 3; i) Annex D (informative) Associated standards was moved to Part 1 and therefore was removed from Part 3; j) Annex F (informative) Applying the decision hierarchy model to manufacturing operations management was removed from Part 3. The corresponding section was removed from Part 1 and replaced with a reference to ISO 15704; k) Annex G (informative) Mapping PSLX ontology to manufacturing operations management was removed from Part 3. The committee felt that this section is more appropriate as a PSLX white paper or TR. The names for data were changed to match the Part 4 standard names. These name changes were made in all figures and in the text.

Previous Editions

Can’t find what you are looking for?

Please contact us at: