REGISTER

FR
Search
×
FR

Placeholder headline

This is just a placeholder headline

API TR 2583 : Measurement of Produced Water for Custody Transfer

$

174

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 2581: Wet Gas Sampling

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 2581 Wet Gas Sampling : Errata 1

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API 510: Pressure Vessel Inspection Code: In-service Inspection, Rating, Repair, and Alteration

$

481

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 6AV1: Validation of Safety and Shutdown Valves for Sandy Service : Edition 4

$

208

BUY NOW

Placeholder headline

This is just a placeholder headline

API 510: Errata 2

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16B Coiled Tubing, Snubbing and Wireline Well Intervention Equipment

$

189

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 5CT: Casing and Tubing w/ Addendum 1

$

518

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 5CT: Casing and Tubing Addendum 1

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 1161: Hazardous Liquid Pipeline Operator Qualification (OQ) : Edition 6

$

301

BUY NOW

API RP 100-2

API RP 100-2: Environmental Aspects Associated with Exploration and Production Operations including

CDN $176.97

This publication was last reviewed and confirmed in 2020.

SKU: 3622ca91ad08 Category:

Description

This document provides recommended practices applicable to the planning and operation of wells, and hydraulically fractured wells. Topics covered include recommendations for managing environmental aspects during planning; site selection; logistics; mobilization, rig-up, and demobilization; and stimulation operations. Also, this document includes guidance for managing environmental aspects during well construction; however, guidance for well construction and fracture stimulation design and execution for onshore wells that can be hydraulically fractured are described in API 100-1. This document provides recommendations for the following topics: a) baseline groundwater sampling; b) source water management; c) material selection; d) transportation of materials and equipment; e) storage and management of fluids and chemicals; f) management of solid and liquid wastes; g) air emissions.

Edition

1

Published Date

2015-08-05

Status

Reaffirmed

Pages

62

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document provides recommended practices applicable to the planning and operation of wells, and hydraulically fractured wells. Topics covered include recommendations for managing environmental aspects during planning; site selection; logistics; mobilization, rig-up, and demobilization; and stimulation operations. Also, this document includes guidance for managing environmental aspects during well construction; however, guidance for well construction and fracture stimulation design and execution for onshore wells that can be hydraulically fractured are described in API 100-1. This document provides recommendations for the following topics: a) baseline groundwater sampling; b) source water management; c) material selection; d) transportation of materials and equipment; e) storage and management of fluids and chemicals; f) management of solid and liquid wastes; g) air emissions.

Previous Editions

Can’t find what you are looking for?

Please contact us at: